Method for chiseling mid-partition of underground engineering group pit
A technology for underground engineering and group pits, which is applied in construction, building maintenance, building construction, etc., can solve problems such as damage to the internal structure of foundation pits, and achieve the effect of good construction efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, but it should be understood that the protection scope of the present invention is not limited by the specific embodiments.
[0035] Unless expressly stated otherwise, throughout the specification and claims, the term "comprise" or variations thereof such as "includes" or "includes" and the like will be understood to include the stated elements or constituents, and not Other elements or other components are not excluded.
[0036] Such as Figure 1 to Figure 10 Shown, according to a kind of method for removing the partition wall in the underground engineering group pit according to the specific embodiment of the present invention, the present embodiment takes a section of about 100 meters long partition wall as an example, and the foundation pit of example is occupied in the actual project Most of the double-layer foundation pits are divided int
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap