Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

2 results about "River bed" patented technology

Telescopic probe monitoring system for riverbedelevation monitoring at bridge piers

InactiveUS20120127300A1Set-up of the system is simpleLow costWater resource protectionColor television detailsMonitoring systemRiver bed
A telescopic probe monitoring system for riverbed elevation monitoring at a bridge pier is revealed. The system includes a measurement module for measuring riverbed elevation under water and a control module. The measurement module includes a housing, a multi-layer tube, a driving member with scales, a photographic unit for capturing images, and a sensing unit. The control module controls the driving member to extend the multi-layer tube. Thus the sensing unit on the bottom of the multi-layer tube contacts the riverbed and then sends a sensing signal to the control module for stopping pushing the multi-layer tube and controlling the photographic unit to capture images of the driving member. According to the images and movement of the measurement module, the control module learns the riverbed elevation and sends the riverbed elevation to a remote monitor unit for real-time monitoring of the riverbed elevation.
Owner:NAT APPLIED RES LAB

Cast-in-place arch bridge combined support structure and construction method thereof

ActiveCN113338165ABridge erection/assemblyArch-type bridgeStructure supportRiver bed
The invention discloses a cast-in-place arch bridge combined support structure and a construction method thereof.The cast-in-place arch bridge combined support structure comprises a first-stage bearing platform, a pile foundation, a second-stage bearing platform, an arch device and a supporting device.The first-stage bearing platform comprises a concrete bottom pile, a supporting column, a reinforcing device and a fixing rod, a U-shaped groove is formed in the top of the concrete bottom pile, and a protruding block is inserted into the bottom of an inner cavity of the U-shaped groove; the supporting column is inserted into the top of the concrete bottom pile. The concrete bottom piles are poured at the bottom of the riverbed, the supporting columns are spliced to the concrete bottom piles, the fixing rods and the limiting rods are used for limiting the supporting columns, and the concrete bottom piles can provide a firm supporting point for the first-stage bearing platform and the second-stage bearing platform so as to facilitate pouring of the arch bridge; in addition, various devices can be conveniently disassembled after the arch bridge is poured, the concrete bottom piles under the water surface do not affect the flowing speed of passing ships and water flow, and therefore the construction safety is greatly improved.
Owner:CIVIL ENG OF CHINA CONSTR SECOND ENG BURESU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products