Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

45results about "Bridge erection/assembly" patented technology

Anti-overturning reinforcing device of single-column-pier bridge

ActiveCN103452053AReduce the influence of partial loadImprove the forceBridge structural detailsBridge erection/assemblyBox girderWidened structure
The invention discloses an anti-overturning reinforcing device of a single-column-pier bridge. The anti-overturning reinforcing device comprises a single-column pier. A widening structure is arranged at the upper end of the single-column pier. A support is arranged at the top end of the widening structure. The anti-overturning reinforcing device of the single-column-pier bridge provided by the invention has the advantages that since a steel cover beam is additionally arranged on a certain middle single-column pier of a continuous box beam along the width direction and dual supports are arranged on the steel cover beam under the situation that the space under the bridge is limited or conditions are not allowed, the influence of unbalanced loads on straight bridges is reduced, the torque and the moment can be effectively improved for curved bridges and skew bridges, the stress of bridge devices is improved and the potential safety hazards are reduced.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD

Quick Repair Method of Existing Expansion Joints in Railway Concrete Bridges

A rapid repair method for the existing expansion joints of railway concrete bridges, comprising the following steps: a, removing residual water-stop rubber strips; b, removing dirt and garbage on the concrete base surface and the exposed surface of metal edge beams, and then Drying; c, installing and positioning the underlayment and side lining; d, spraying the primer; e, pouring the repair material; f, spraying the top coat; g, after the repair material is basically cured, the repair is completed. The repair method of the invention can adapt to various irregular sizes of bridge joints; installation and replacement are fast and convenient; the polyurethane repair material itself has good durability and weather resistance, and is suitable for rapid repair; the price is moderate, and it is convenient for mass use.
Owner:RAILWAY ENG RES INST CHINA ACADEMY OF RAILWAY SCI

Method for actively reinforcing wide-span concrete case beam bridge web

ActiveCN101435184ABridge erection/assemblySpecial data processing applicationsTension stressDistribution rule
The invention relates to a reinforcing and repairing measure for existing concrete box girder bridges, and discloses a method for actively reinforcing a large-span concrete box girder bridge web plate, comprising the following steps: (1) according to the structural parameters of the concrete box girder bridge and by adopting a structural analysis method and corresponding general or special analysis software, a finite element model of a simulated reinforced plate shell concrete box girder bridge is established, thus obtaining the magnitude of the main pulling stress, the vertical stress, the longitudinal stress and the shearing stress of the box girder web plate before reinforcement and the distribution rule thereof; (2) the difference between the main pulling stress and the limited value allowed by the 'Standard' is compared to obtain the target increment value of the vertical stress of the bridge girder, and the actual reinforcement parameters are determined according to the target value; (3) drilling is carried out on the upper margin and the lower margin of the concrete box girder web plate, steel strands are installed and transversally stretched; (4) a wedge block A is used for jacking up the steel strands, then a jack is used for jacking up and pulling the steel strands to the allowed tensioning force, and the steel strands are tensioned one by one; and (5) crack is mended.
Owner:广东荣骏建设工程检测股份有限公司

Steel-concrete combination deck plate and construction method thereof

ActiveCN106638302AReduce thicknessImprove binding structureBridge structural detailsBridge erection/assemblySheet steelRebar
The invention relates to a steel-concrete combination deck plate and a construction method thereof, wherein the steel-concrete combination deck plate comprises: bottom steel plates arranged on steel girders, wherein the bottom steel plates in the bearing regions of the steel girders are bent in shape, and the bottom steel plates are 8-10 mm in thickness; a plurality of shear plates vertically connected to the bottom steel plates; a concrete tier including reinforcement fabric penetrating through the shear plates, wherein the concrete tier is cast to the bottom steel plates, and the combination deck plate is 10-15 cm in thickness. The steel-concrete combination deck plate uses the bottom steel plates as stress-bearing parts as well as a formwork for a cast-in-place desk concrete tier, and steps of mounting and releasing concrete formwork are omitted; the shear plates serve as stiffeners for the bottom steel plates, good combination of the bottom steel plates with the concrete tier can be guaranteed, and cracking of the concrete tier is prevented; the deck thickness is controlled to 10-15 cm and is reduced, the weight is 25% and above lower than that of a composite beam deck system, dead load is reduced, crossing ability, structural strength and durability of the main structure are improved, construction input is reduced, and the efficiency of a construction method is high.
Owner:SICHUAN DEPT OF TRANSPORTATION HIGHWAY PLANNING PROSPECTING & DESIGN RES INST

System conversion method of first cable later beam construction of self-anchored suspension bridge

InactiveCN106149569AAchieve safe disassemblySolve the problem that construction is difficultSuspension bridgeBridge erection/assemblyHorizontal forcePull force
The invention relates to a system conversion method of first cable later beam construction of a self-anchored suspension bridge. The method includes: building the edge beams and bridge towers of the self-anchored suspension bridge, mounting temporary bridge tower anchoring devices, setting up a main cable to form the main beam sections of a main beam, and determining the position of a final closure; evenly arranging a plurality of bridge tower jacks in each temporary bridge tower anchoring device, and evenly arranged a plurality of closure jacks at the final closure starting the closure jacks and the bridge tower jacks, and controlling the actual total jacking force of the closure jacks and the bridge tower jacks to be equal to the horizontal pull force of the main cable to the edge beams; using a hierarchical symmetrical unloading manner to regulate the gap distance of the closure, and locking the closure jacks and the bridge tower jacks until the gap distance satisfies the welding requirement so as to complete the system conversion of the first cable later beam construction of the self-anchored suspension bridge. The method has the advantages that the temporary bridge tower anchoring devices can be demounted safely, stable conversion of the horizontal force from the temporary bridge tower anchoring devices to the closure gap regulating device can be achieved, and closure gap regulation can be performed smoothly.
Owner:CHANGAN UNIV

Construction method of mutilevel overpass scaffold

InactiveCN101696566AAdvantages of construction methodFlexible construction organizationBridge erection/assemblyBuilding scaffoldsFalseworkDeformation monitoring
The invention discloses a construction method of mutilevel overpass scaffold, comprising the following steps: building a bottom layer scaffold provided with steel frame doorways for vehicles and pedestrians to pass, checking and installing a deformation monitoring system, and carrying out a load pressure test on the bottom layer scaffold; building at least two layers of bridge scaffolds on the bottom layer scaffold, building box girder doorways for bridge construction on the bridge scaffold, installing the deformation monitoring system on the box girder doorway and carrying out comprehensive load test. The bottom layer scaffold is provided with the steel frame doorway so as to meet the passing demand of big traffic flow; each layer of the middle part can be provided with the mutually crossed box girder doorways in the same plane and can be provided with the mutually crossed box girder doorways in the vertical direction, therefore optionally carrying out construction according to requirements; the whole scaffold only needs to be built and removed once, not only shortening the building and removing time of the scaffold but also reducing the risk of building and removing the scaffold; and each level of bridge can be constructed at the same time, and therefore, the construction period is short and the construction cost is low.
Owner:CHINA METALLURGICAL CONSTR ENG GRP

Web-covering-baseplate trapezoid (wave-shaped) steel plate combined box girder and construction method thereof

PendingCN107558351ABridge erection/assemblyBridge materialsRebarStructural system
The invention relates to a web-covering-base trapezoid (wave-shaped) steel plate combined box girder and a construction method thereof. The web-covering-base trapezoid (wave-shaped) steel plate combined box girder comprises a box girder composite baseplate, a box girder composite structure top plate, trapezoid steel webs and a box girder partition plate. The box girder composite baseplate with a composite structure is formed by pouring epoxy asphalt concrete onto a trapezoid steel plate. The box girder composite structure top plate is a combined structure of a trapezoid steel plate beam and reinforced concrete. Before erection of the box girder, the trapezoid steel plate, the trapezoid steel plate beam and the trapezoid steel webs are welded or connected in other ways to form an integral structural system. The web-covering-base trapezoid (wave-shaped) steel plate combined box girder and the construction method thereof have the advantages that longitudinal reinforcement binding and prestressing tendon pipeline laying of a prefabricated overall framework are completed, beam bodies or beam segment framework integral structures are hoisted and erected directly, and the reinforced concrete baseplate and the reinforced concrete top plate of the box girder are poured finally; baseplate concrete is flush with steel web flanges; the shape of a bridge is attractive, and construction is facilitated.
Owner:SHENZHEN MUNICIPAL DESIGN & RES INST +1

Banana-type bridge construction safety ladder

ActiveCN103924519AVersatileImprove bearing capacityBridge erection/assemblyScaffold accessoriesAdjacent levelMultiple function
The invention discloses a banana-type bridge construction safety ladder and relates to a safety ladder. The banana-type bridge construction safety ladder comprises adjustable bases, vertical rods, transverse rods, pin cartridges, diagonal rods, and banana head cross braces. The vertical rods are arranged around the adjustable bases. The pin cartridges are disposed on the vertical rods. Both the transverse rods and the banana head cross braces are disposed between the vertical rods through the pin cartridges. The diagonal rods are diagonally disposed on the pin cartridges at the opposite corners of each two adjacent levels of the vertical rods. A ladder is arranged between each two banana head cross braces at different heights. Each ladder is provided with platform access steps. The banana-type bridge construction safety ladder is composed of a banana scaffold and a special zigzag ladder, has multiple functions, and is high in bearing capacity, safe and reliable, simple and convenient to mount, and highly practicable.
Owner:开平市宏优金属制品有限公司

Capping beam post tensioning end sealing construction trolley

The invention belongs to the field of highway construction and discloses a capping beam post tensioning end sealing construction trolley. The capping beam post tensioning end sealing construction trolley comprises a truss body, running wheels, a lifting frame, an operation platform and a driving system; bottom beams are arranged at the bottom of the truss body; the running wheels are fixedly arranged at the bottoms of the bottom beams; the truss body comprises a truss bottom beam, a truss top beam, a chord member, a counterweight and jacks; the chord member is arranged between the truss bottombeam and the truss top beam; the operation platform comprises two capping beam underpinning beams, multiple bracket lining beams, a platform plate, an adjustable screw sleeve, a carrying pole beam and two capping beam lifting rods; the top of the lifting frame is hinged at one end of the truss top beam through a pin shaft; one ends of the two capping beam underpinning beams are correspondingly hinged with the bottom of the lifting frame; the other ends of the two capping beam underpinning beams are correspondingly hinged with the capping beam lifting rods; the capping beam lifting rods are hinged with the carrying pole beam on a capping beam; one end of the adjustable screw sleeve is hinged with the lifting frame; and the other end of the adjustable screw sleeve is hinged with the operation platform. According to the capping beam post tensioning end sealing construction trolley, the construction efficiency is enhanced, and the capping beam post tensioning end sealing construction trolley can be widely applied to the construction field.
Owner:CHINA RAILWAY 12TH BUREAU GRP +1

Reinforcing device for reinforcing bridge pier through cofferdam-free underwater enlarging section method and construction method thereof

The invention discloses a reinforcing device for reinforcing a bridge pier through a cofferdam-free underwater enlarging section method. The device comprises template systems and limiting devices, wherein the template systems are matched with the bridge pier in shapes, the template systems are arranged outside the bridge pier in a sleeving mode, the plurality of template systems are sequentially overlapped from bottom to top so as to cover the whole bridge pier, the template system located at the bottommost part is fixed on a bridge table, the adjacent template systems are seamlessly connectedthrough bolts I, the limiting devices are arranged between every template system and the pier, the limiting devices are matched with the bridge pier in shapes, the inner sides of the limiting devicesare fixedly installed on the outer surface of the bridge pier, and the outer sides of the limiting devices are in contact with the template systems. According to the device, the template systems andthe limiting devices can be used for construction of the cofferdam-free underwater enlarging section method for reinforcing circular, rectangular or other shape bridge piers or columns, the construction speed is high, the cost is low, and the thickness of a reinforced layer concrete can be effectively ensured to coincide with the design.
Owner:HUNAN UNIV OF SCI & TECH

Construction method for modern bamboo pedestrian truss bridge

InactiveCN104631327AGuaranteed spanGood yieldTruss-type bridgeBridge structural detailsBridge deckPedestrian
The invention discloses a construction method for a modern bamboo pedestrian truss bridge. A truss bridge structure comprises a pairs of bridge piers, two columns of erection supports and a main truss, wherein the bridge piers are made of concrete; the erection supports are fixed on the bridge piers and made of steel materials; the main truss is connected to the erection supports and composed of ball node elements and connecting rods, the ball node elements are made of the steel materials, and the connecting rods are made of heavy bamboo materials. The truss bridge structure further comprises a bridge deck slab and handrails, and the bridge deck slab and the handrails are made of the heavy bamboo materials. The construction method is characterized by comprising the steps of element prefabricating, preassembling, bridge pier forming by cast-in-place, full framing constructing to complete bridge body installation and waterproof paint painting. The construction method for the modern bamboo pedestrian truss bridge has the advantages that the element connection is convenient, the construction is simple and fast, the modulization production is facilitated, the bridge weight is light, the anti-seismic property is good, and nodes are stable and reliable; therefore the obtained pedestrian truss bridge has the advantages of being green, low carbon, environment-friendly and economical, and the requirements of the normal use and the durability of a bridge structure are met.
Owner:CHONGQING JIAOTONG UNIV

Bridge rainwater pipe construction vehicle

The invention provides a bridge rainwater pipe construction vehicle which comprises a four-wheel drive trolley, a vehicle main frame is installed on the trolley, a rotating mechanism is installed above the center of the vehicle main frame, a gear is arranged below the rotating mechanism, the rotating mechanism is driven by a driving motor installed on the vehicle main frame to rotate, and the rotating mechanism can rotate by 360 degrees in the horizontal direction. An installation part is fixedly installed above the rotating mechanism, a telescopic arm penetrates through the installation part,a lifting box is arranged at one end of the telescopic arm, a lifting arm penetrates through the lifting box, a first construction basket is arranged at the lower end of the lifting arm, a rotating arm is arranged below the first construction basket, and a second construction basket is arranged below the rotating arm. According to the invention, constructors can conveniently conduct multi-personcooperative construction operation on the first construction basket body and the second construction basket body, the safety of the constructors can be effectively guaranteed, the operation efficiencycan be effectively improved, the operation coverage area is comprehensive, the construction basket can adapt to various operation environments, the construction difficulty is reduced to a great extent, and construction is more efficient.
Owner:广西正景机械制造有限公司

Cast-in-place arch bridge combined support structure and construction method thereof

ActiveCN113338165ABridge erection/assemblyArch-type bridgeStructure supportRiver bed
The invention discloses a cast-in-place arch bridge combined support structure and a construction method thereof.The cast-in-place arch bridge combined support structure comprises a first-stage bearing platform, a pile foundation, a second-stage bearing platform, an arch device and a supporting device.The first-stage bearing platform comprises a concrete bottom pile, a supporting column, a reinforcing device and a fixing rod, a U-shaped groove is formed in the top of the concrete bottom pile, and a protruding block is inserted into the bottom of an inner cavity of the U-shaped groove; the supporting column is inserted into the top of the concrete bottom pile. The concrete bottom piles are poured at the bottom of the riverbed, the supporting columns are spliced to the concrete bottom piles, the fixing rods and the limiting rods are used for limiting the supporting columns, and the concrete bottom piles can provide a firm supporting point for the first-stage bearing platform and the second-stage bearing platform so as to facilitate pouring of the arch bridge; in addition, various devices can be conveniently disassembled after the arch bridge is poured, the concrete bottom piles under the water surface do not affect the flowing speed of passing ships and water flow, and therefore the construction safety is greatly improved.
Owner:CIVIL ENG OF CHINA CONSTR SECOND ENG BURESU

Control system and implementation method for bridge damping

The invention discloses a control system and an implementation method for bridge damping. The control system for bridge damping comprises a device body, a connection device arranged in the device body, a painting device arranged in the device body and a cleaning device arranged in the device body. The connection device comprises a power device and a clamping device, a liquid cavity is formed in the upper end of the power device, the painting device comprises a painting cavity formed in the device body, and a conveying belt is rotatably arranged in the painting cavity. The control system for bridge damping can automatically and preliminarily paint paints, dust is effectively cleaned and base gel is uniformly painted, the dust is collected in the device after the dust is removed, the collection device is valid and energy sources are not wasted, collection parts are easy to disassemble and clean, removal and painting are carried out successively on the same side of the device, and a processed painting area cannot be affected.
Owner:安徽明峰建筑工程有限公司

Cutting, refilling and repairing device for bridge pavement cracks

The invention discloses a cutting, refilling and repairing device for bridge pavement cracks, comprising a repair vehicle, wherein an in-vehicle cavity with a downward opening is formed in the repairvehicle; a slide cavity is formed in the right wall of the in-vehicle inner cavity in a communicating mode; a hydraulic rod is fixedly connected to the lower wall of the slide cavity; a motor shell isfixedly connected to the upper end of the hydraulic rod; a motor is fixedly arranged in the motor shell; a main screw is in power connection to the left end of the motor; and a cutting wheel swing barrel is rotatably connected on the main screw. The cutting, refilling and repairing device for bridge pavement cracks provided by the invention can repair wider cracks in a concrete bridge deck, usesa cutting wheel with an adjustable cutting direction to cut slots around the cracks, uses a chiseling hammer which works in a reciprocating mode to chisel away cracked cement in the slots, and fills repairing stuffing into the slots to level off, thereby reducing manual operation and saving time and labor.
Owner:JIANGSHAN HONGLI PROD DESIGN CO LTD

Composite pier anti-seismic reinforcement structure and construction method thereof

PendingCN110029596ABridge structural detailsBridge erection/assemblyRebarStiffness degradation
The invention relates to a composite pier anti-seismic reinforcement structure and a construction method thereof. The composite pier anti-seismic reinforcement structure comprises a cover beam and a bearing platform which are connected through pier columns, a plurality of vertical grooves are formed in the peripheries of the tops and bottoms of the pier columns, preformed holes matched with the vertical grooves are formed in the lower side surface of the cover beam and the upper side surface of the bearing platform, steel bars are arranged in the vertical grooves, and the steel bars extend into the preformed holes. Common concrete layers are arranged on the peripheries of the tops and bottoms of the pier columns, wherein the vertical grooves are coated with the common concrete layers, theouter sides of the common concrete layers are circumferentially coated with FRP cloth, pouring gaps are reserved between the FRP cloth and the common concrete layers, and the pouring gaps are filled with expansion concrete layers. The composite pier anti-seismic reinforcement structure and the construction method thereof have the advantages of simple structure, reasonable design and convenient construction, joint reinforcement is carried out by the implanted steel bars and FRP materials, the shear resistance bearing capacity, deformation performance, stiffness degradation, ductility, energy dissipation capacity and the like of a pier are improved to varying degrees, the anti-seismic vulnerability of the pier is reduced, a good fixing role can be achieved, and the structure can further be used for reinforcing the pier after an earthquake.
Owner:FUZHOU UNIVERSITY

Disturbance reinforcing structure and construction method of existing bridge in deep valley

The disturbed reinforcement structure and construction method of existing bridges in deep valleys can effectively solve the problems of deformation and stability reinforcement of high-pier long-span bridges in steep slopes and valleys after disturbance, and has the characteristics of good economy, convenient construction, and environmental protection. The reinforcement structure includes: supporting pile foundations and supporting beams. The supporting pile foundations are arranged at intervals in the valley corresponding vertically to the foundation of the reinforced bridge abutment. The supporting beams are fixedly connected to the top of each supporting pile foundation, and their front ends are in close contact with the reinforced bridge abutment. , the rear end extends into the stable bedrock of the valley slope on the corresponding side of the reinforced bridge abutment; the reinforcement piles and soil retaining plates are arranged at intervals on the lower side of the valley in the influence range of the reinforced bridge abutment foundation, and the soil retaining plates are set at intervals Between the reinforcement piles and facing the upstream side of the valley; the waste muck body and the sealing layer, the waste muck body is filled in layers in the valley inside the reinforcement piles and the retaining plate, and the sealing layer is constructed on the top surface of the waste muck body.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Highway bridge widening reconstruction project line-crossing protection structure

ActiveCN111441651AEasy to use for dust suppressionEasy to store and adjustUsing liquid separation agentFencingArchitectural engineeringStructural engineering
The invention discloses a highway bridge widening reconstruction project line-crossing protection structure. The highway bridge widening reconstruction project line-crossing protection structure comprises a protection baffle, a water pipe clamping block, a reflective stripe and a pull block, a base is mounted below the protection baffle, a clamping plate is mounted on the outer side of a limitingplate, the water pipe clamping block is fixed to the top of the protection baffle, an empty groove located in the back face of the protection baffle is formed in the outer side of a partition board, aleaking groove located in the protection baffle is mounted below a fixed rod, a collection bin is mounted on the inner side of a placing groove, a connecting groove is formed in the outer side of a pull rope, an inserting rod is connected to the bottom end of the pull rope, and is located in a storage groove, and a spring is mounted on the inner side of the storage groove. According to the highway bridge widening reconstruction project line-crossing protection structure, dust falling work use is facilitated, dust can be collected, storage adjusting is facilitated, meanwhile, moving is conveniently carried out, combined use is facilitated, and road indication is carried out.
Owner:黑龙江省龙建路桥第一工程有限公司

Method for mounting tower crane on top surface of shaped bridge

InactiveCN106149571ALow costReduce standard section usageBridge erection/assemblyReinforced concreteRebar
The invention discloses a method for mounting a tower crane on the top surface of a shaped bridge. The method comprises the following steps of: (1) manufacturing a steel structure tower crane foundation, and welding a standard knot base to the tower crane foundation so as to manufacture a steel structure base; (2) drilling a plurality of holes in the top surface of an existing bridge or an existing structure object, or embedding anchor bolts in reinforced concrete, and anchoring the steel structure base on the top surface of the bridge or the top surface of a building through high-strength bolts; (3) mounting the tower crane on the steel structure base in the step (1); and (4) completing the mounting of the tower crane by a conventional method. According to the method disclosed by the invention, an existing structure object is used as a foundation, and the foundation of the tower crane does not need to be built additionally. When the bearing capacity of a ground base around the building is poor, and a water surface, a water edge or the like do not have conditions of building the foundation of the tower crane, the existing building is used for building the tower crane, so that the cost of the foundation of the tower crane can be saved. Steel members do not need to be embedded into concrete, and various materials can be repeatedly used, so that material wastage is reduced, and the cost is reduced.
Owner:WUJIANG CITY MINGGANG ROAD & BRIDGE

Wooden bridge and installation process thereof

PendingCN113089451AReinforcementPlay a protective effectBridge structural detailsEducational modelsArchitectural engineeringBridge deck
The invention provides a wooden bridge and an installation process thereof, and belongs to the technical field of viaducts. The wooden bridge comprises: a plurality of bridge column bearing platforms; multiple bridge column assemblies which are arranged on the upper sides of the multiple bridge column bearing platforms correspondingly, wherein the multiple bridge column assemblies and the bridge column bearing platforms are in one-to-one symmetry; multiple sets of bridge column wrapping decoration assemblies which are arranged on the front sides and the rear sides of the multiple sets of bridge column assemblies correspondingly, wherein protection on the front sides and the rear sides of the bridge column assemblies is achieved; longitudinal beam assemblies which are arranged on the upper sides of the two longitudinal bridge column assemblies respectively; a plurality of groups of cross beam assemblies which are respectively arranged between the two groups of longitudinal beam assemblies; and multiple groups of bridge floor assemblies which are arranged on the upper sides of the multiple groups of cross beam assemblies. According to the device, the wooden bridge can be installed through the rubber hammers and the screws, so that the wooden bridge can be installed more simply and safely, and students can use the device to install the viaduct in a short time.
Owner:深圳市亿企国际教育科技有限公司

Movable trolley for bridge guardrail formwork assembly and disassembly and construction method thereof

PendingCN114032786ALower requirementCleanliness is not highBridge structural detailsBridge erection/assemblyCantilevered beamArchitectural engineering
The invention discloses a movable trolley for bridge guardrail formwork assembly and disassembly and a construction method thereof. The movable trolley comprises a tire type walking chassis and a hanging basket which are arranged on the two sides of a guardrail formwork to be mounted and dismounted respectively, a cargo carrying platform is arranged on the tire type walking chassis, the cargo carrying platform is connected with a horizontally-arranged cantilever beam through a first support, the hanging basket is also connected to the cantilever beam through a second support, a crane is installed above the cantilever beam through a third support, the crane is located above the guardrail formwork to be mounted and dismounted, and the cargo carrying platform is used for containing the guardrail formwork needing to be mounted or dismounted. By means of the walking function of the tire type walking chassis, a formwork is conveyed to a construction position needed by a concrete wall body in a pipe ditch, then a chain block is used for assisting formwork installation personnel in adjusting the height of the formwork, and formwork installation and reinforcement work is completed. In a limited working plane, the formwork mounting position is accurate, the formwork mounting and dismounting time is shortened, the construction quality is improved, and the engineering cost is reduced.
Owner:SCEGC MECHANIZED CONSTR GRP COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products