Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

9 results about "Bridge deck" patented technology

Construction method for modern bamboo pedestrian truss bridge

InactiveCN104631327AGuaranteed spanGood yieldTruss-type bridgeBridge structural detailsBridge deckPedestrian
The invention discloses a construction method for a modern bamboo pedestrian truss bridge. A truss bridge structure comprises a pairs of bridge piers, two columns of erection supports and a main truss, wherein the bridge piers are made of concrete; the erection supports are fixed on the bridge piers and made of steel materials; the main truss is connected to the erection supports and composed of ball node elements and connecting rods, the ball node elements are made of the steel materials, and the connecting rods are made of heavy bamboo materials. The truss bridge structure further comprises a bridge deck slab and handrails, and the bridge deck slab and the handrails are made of the heavy bamboo materials. The construction method is characterized by comprising the steps of element prefabricating, preassembling, bridge pier forming by cast-in-place, full framing constructing to complete bridge body installation and waterproof paint painting. The construction method for the modern bamboo pedestrian truss bridge has the advantages that the element connection is convenient, the construction is simple and fast, the modulization production is facilitated, the bridge weight is light, the anti-seismic property is good, and nodes are stable and reliable; therefore the obtained pedestrian truss bridge has the advantages of being green, low carbon, environment-friendly and economical, and the requirements of the normal use and the durability of a bridge structure are met.
Owner:CHONGQING JIAOTONG UNIV

Fully-assembled prefabricated concrete girder bridge superstructure and construction method thereof

PendingCN108589507AAvoid conversionLong construction periodBridgesBridge deckPre embedding
The invention discloses a fully-assembled prefabricated concrete girder bridge superstructure and further provides a construction method of the fully-assembled prefabricated concrete girder bridge superstructure. The fully-assembled prefabricated concrete girder bridge superstructure comprises prefabricated concrete box girder single bodies, prefabricated concrete guardrails and a bridge deck paving layer. The prefabricated concrete box girder single bodies comprise prefabricated concrete box girder bodies; flange plates are arranged on the two sides of top plates of the prefabricated concretebox girder bodies; transverse splicing rigid prefabricated pieces are pre-embedded in the flange plates; the prefabricated concrete box girder single bodies further comprise transverse partition plates, and transverse partition plate splicing rigid prefabricated pieces are pre-embedded in the transverse partition plates; longitudinal splicing rigid prefabricated pieces are pre-embedded in the twoends of the prefabricated concrete box girder bodies; the adjacent prefabricated concrete box girder single bodies are transversely and longitudinally spliced; and the prefabricated concrete guardrails are connected with the prefabricated concrete box girder single bodies, and guardrail locking nuts are assembled on guardrail connecting bolts. Through the structure, cast-in-place concrete and negative moment prestressed ribs of the prefabricated concrete girder bridge superstructure in the connecting construction process can be omitted, and all components of the superstructure are fully assembled.
Owner:HEBEI UNIV OF TECH

Cutting, refilling and repairing device for bridge pavement cracks

The invention discloses a cutting, refilling and repairing device for bridge pavement cracks, comprising a repair vehicle, wherein an in-vehicle cavity with a downward opening is formed in the repairvehicle; a slide cavity is formed in the right wall of the in-vehicle inner cavity in a communicating mode; a hydraulic rod is fixedly connected to the lower wall of the slide cavity; a motor shell isfixedly connected to the upper end of the hydraulic rod; a motor is fixedly arranged in the motor shell; a main screw is in power connection to the left end of the motor; and a cutting wheel swing barrel is rotatably connected on the main screw. The cutting, refilling and repairing device for bridge pavement cracks provided by the invention can repair wider cracks in a concrete bridge deck, usesa cutting wheel with an adjustable cutting direction to cut slots around the cracks, uses a chiseling hammer which works in a reciprocating mode to chisel away cracked cement in the slots, and fills repairing stuffing into the slots to level off, thereby reducing manual operation and saving time and labor.
Owner:JIANGSHAN HONGLI PROD DESIGN CO LTD

Bridge structure safety evaluation method and device based on big data

PendingCN112561257AAchieve daily routine assessmentReduce human interferenceResourcesBridge deckSystem monitor
The invention discloses a bridge structure safety evaluation method and device based on big data, and the method comprises the steps of obtaining the score of each measurement point of each type, obtaining each monitoring item score of the bridge superstructure, each monitoring item score of the bridge substructure and each monitoring item score of the bridge deck system according to the score ofeach measuring point of each type; obtaining a monitoring item score of the bridge superstructure monitored by the sensor, a monitoring item score of the bridge substructure monitored by the sensor and a monitoring item score of the bridge deck system monitored by the sensor; acquiring a safety score of the bridge based on sensor monitoring; obtaining a comprehensive score of the bridge based on monitoring and detection; the invention has the advantages that the evaluation structure is comprehensive, the data is acquired in real time, and the real-time performance is good.
Owner:HEFEI ZEZHONG CITY INTELLIGENT TECH CO LTD +1

Wooden bridge and installation process thereof

PendingCN113089451AReinforcementPlay a protective effectBridge structural detailsEducational modelsArchitectural engineeringBridge deck
The invention provides a wooden bridge and an installation process thereof, and belongs to the technical field of viaducts. The wooden bridge comprises: a plurality of bridge column bearing platforms; multiple bridge column assemblies which are arranged on the upper sides of the multiple bridge column bearing platforms correspondingly, wherein the multiple bridge column assemblies and the bridge column bearing platforms are in one-to-one symmetry; multiple sets of bridge column wrapping decoration assemblies which are arranged on the front sides and the rear sides of the multiple sets of bridge column assemblies correspondingly, wherein protection on the front sides and the rear sides of the bridge column assemblies is achieved; longitudinal beam assemblies which are arranged on the upper sides of the two longitudinal bridge column assemblies respectively; a plurality of groups of cross beam assemblies which are respectively arranged between the two groups of longitudinal beam assemblies; and multiple groups of bridge floor assemblies which are arranged on the upper sides of the multiple groups of cross beam assemblies. According to the device, the wooden bridge can be installed through the rubber hammers and the screws, so that the wooden bridge can be installed more simply and safely, and students can use the device to install the viaduct in a short time.
Owner:深圳市亿企国际教育科技有限公司

Gradient functional bridge deck pavement material and preparation method thereof

ActiveCN111439956AImprove shear resistanceAvoid crackingBridge deckStructural engineering
The invention belongs to the technical field of bridge deck pavement, and particularly relates to a gradient functional bridge deck pavement material and a preparation method thereof. The gradient functional bridge deck pavement material is prepared from the following components in parts by weight: 10 to 25 parts of pouring type asphalt cement, 75 to 90 parts of mineral aggregate, 1 to 2 parts ofsteel fiber and 0.4 to 1 part of additive, wherein the mineral aggregate comprises light aggregate, common aggregate and mineral powder, and the light aggregate accounts for 1-99% of the total mass ofthe mineral aggregate. The density difference between the light aggregate and the common aggregate and the cementing material is utilized, the paving top surface is enriched with the light aggregate,the effect of enhancing the interlayer shear resistance is achieved, the bottom surface is enriched with the common aggregate and the cementing material, and the deformation compliance is fully exerted. Meanwhile, the weight of the bridge deck pavement can be reduced by 10-60% under the condition that the thickness is not changed, or the pavement thickness can be increased by 1-3 cm under the condition that the dead load is not changed. Furthermore, the purposes of saving high-quality aggregate and protecting the environment can be achieved.
Owner:JIANGSU SINOROAD ENG TECH RES INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products