81 results about "Cement" patented technology

A cement is a binder, a substance used for construction that sets, hardens, and adheres to other materials to bind them together. Cement is seldom used on its own, but rather to bind sand and gravel (aggregate) together. Cement mixed with fine aggregate produces mortar for masonry, or with sand and gravel, produces concrete. Cement is the most widely used material in existence and is only behind water as the planet's most-consumed resource.

Cement composition

InactiveUS20050016421A1High strengthImprove abilitiesOrganic fertilisersSoil conditioning compositionsPhosphateSilicic acid
To provide a novel cement which is alkalescent, capable of solidifying a wide range of soil and applicable to biological environment. That is, a cement composition comprising 100 parts by weight of magnesium oxide comprising 5 to 25% by weight of at least any one of silicic acid, alumina and iron oxide, 3 to 35 parts by weight of a phosphate, 2 to 30 parts by weight of gypsum and 0.005 to 7 parts by weight of an oxycarboxylic acid or a ketocarboxylic acid.
Owner:NAT AGRI & FOOD RES ORG +1

Double-layer dragon fruit planting method

ActiveCN107258270AMeet the growth characteristicsIncrease productionExcrement fertilisersBioloigcal waste fertilisersDiseaseLand resources
The invention discloses a double-layer dragon fruit planting method. Rectangular pieces are made firstly, the line spacing is 2.8-3.2 m, the width of the rectangular pieces is 1.4-1.8 m, and the height of the rectangular pieces is 20-30 cm. Cement columns with the radius of 5-7 cm are uniformly arranged on the rectangular pieces at intervals of 2-3 m, wherein the height is 175-185 cm. Two layers of rectangular frames are arranged on the columns, the lower-layer height is 95-105 cm, the upper-layer height is 170-180 cm, and the upper layer of rectangular frames is 3-5 cm away from the top ends of the columns. The width of the rectangular frames is 26-35 cm. Bamboo poles are arranged among the columns, long and short bamboo poles are arranged at intervals, long bamboo poles are connected with upper-layer long rods, short bamboo poles are connected with lower-layer long rods, and the separation distance of the bamboo poles is 40-50 cm. During planting, seedling selection, leveling, fertilization and separated planting, water and fertilizer management, branch pruning, flower and fruit management and dragon fruit planting management of disease and pest prevention and control are performed. The double-layer dragon fruit planting method adopts planting frames on the premise that the dragon fruit growth requirement is met and fully utilizes land resources and light conditions, the acre yield, quality and sweetness of dragon fruits are improved, and the economic benefits of dragon fruit planting are increased.
Owner:罗明艺

Asphalt pavement structure suitable for Tibet plateau area and construction method thereof

InactiveCN106868972AImprove road performanceImprove bending deformationIn situ pavingsSurface layerRoad surface
The invention relates to an asphalt pavement structure suitable for the Tibet plateau area and a construction method thereof. The asphalt pavement structure suitable for the Tibet plateau area sequentially comprises a cushion layer, a semi-rigid base layer, a penetrable layer, an SBR emulsified asphalt lower sealing layer, a lower surface layer, a bonding layer and an upper surface layer from bottom to top. The construction method of the asphalt pavement structure suitable for the Tibet plateau area comprises the following steps of (1) tamping and leveling a roadbed, (2) laying the cushion layer on the roadbed, (3) laying a cement stabilized sand gravel layer on the cushion layer, (4) flatly laying a low-shrinkage super-early-strength cement stabilized macadam layer, (5) laying the penetrable layer, (6) laying the SBR emulsified asphalt lower sealing layer, (7) laying the lower surface layer, (8) laying the bonding layer, and (9) laying the upper surface layer.
Owner:QINGHAI ACAD OF TRANSPORTATION SCI +1

Construction method of structural system with structural floors as horizontal braces

InactiveCN104631466AControl and reduce distortionImprove securityExcavationsPurlinReinforced concrete
The invention belongs to the technical field of buildings and particularly relates to a construction method of a structural system with structural floors as horizontal braces. The method comprises the steps that 1, an envelope structure, cement-mixed piles, engineering pile foundations, structure columns, first steel latticework columns, a supporting pile foundation, a supporting column and second steel latticework columns are constructed in a foundation pit; 2 and 3, earth is excavated to the bottom of first reinforced concrete inner supports, and the first reinforced concrete inner supports and first enclosing purlins are constructed; 4, the earth continues to be excavated downwards, and temporary supports or all floor structures and concrete inner supports are constructed; 5, the earth is excavated to a foundation slab, and a bedding layer, a bearing platform and the foundation slab are constructed; 6, the contained temporary supports are dismantled, and if the temporary supports are not contained, the next step is executed; 7, side walls of all the floor structures, earth outlet holes reserved in all the structural floors and a beam and slab structure on the top are constructed. According to the construction method, foundation engineering and upper structures are constructed at the same time, the construction time can be greatly shortened, the construction cost can be saved, and therefore the total cost of a project can be saved.
Owner:TIANSONG CONSTR GRP

Thermal insulation material and preparation method thereof

InactiveCN107721451AEvenly dispersedEffective control of cell stabilityConstruction materialCeramicwareFoaming agentPolymer science
The invention discloses a thermal insulation material and a preparation method thereof. The thermal insulation material comprises a cement-based block skeleton and graphene modified polystyrene, wherein the cement-based block skeleton comprises multiple cavities; the multiple cavities are filled with graphene modified polystyrene; and graphene modified polystyrene is formed by performing melt extrusion on graphene and polystyrene resin according to a weight ratio of 1:(1-5) in the multiple cavities in the presence of an alkane foaming agent. According to the thermal insulation material disclosed by the invention, the strength and thermal insulation property are further improved.
Owner:ZHONGJING ECO IND CO LTD

Multifunctional rotary drilling rig

InactiveCN103147689ALower purchase costImprove work efficiencyEarth drilling toolsDerricks/mastsFoundation engineeringWinch
The invention relates to a multifunctional rotary drilling rig and belongs to the field of foundation engineering construction equipment. The multifunctional rotary drilling rig comprises a chassis, an upper wagon mounted on the chassis, a diagonal bracing oil cylinder mounted on the upper wagon and a mast, wherein the mast is connected with a winch box and the diagonal bracing oil cylinder; the winch box is fixed at the front end of the upper wagon; a guide device is mounted at the tail end of the mast; and a soil remover is arranged above the guide device and also arranged on the mast. The multifunctional rotary drilling rig integrates functions of a rotary drilling rig, a CFG (Cement Flyash Gravel Pile) drilling rig and a screw pressure soil squeezing and filling pile drilling rig, and realizes multiple functions and construction by multiple construction methods; the cost for purchasing the drilling rig is saved; and the working efficiency is improved.
Owner:SHANDONG XINGUO HEAVY MASCH TECH CO LTD

Cyclic replacement grouting device and process of hole drilling fixing pipe

PendingCN108194047AReduce risk of sheddingAvoid large contactSealing/packingSlurryEngineering
The invention discloses a cyclic replacement grouting process of a hole drilling fixing pipe. The cyclic replacement grouting process is divided into hole drilling, cyclic grouting and cyclic replacement of thin slurry by thick slurry. A device adopting the process is further provided and comprises a hole drilling machine, a grouting pump, a mixing barrel, a slurry sucking pipeline, a grouting pipeline, a slurry return pipeline and a hole sealing device; and a hole drilling machine pipeline is connected with the grouting pump, one end of the grouting pump is connected with the mixing barrel through the slurry sucking pipeline, the other end of the grouting pump is connected with an inlet of the hole sealing device through the grouting pipeline, and an outlet of the hole sealing device is connected with the mixing barrel through the slurry return pipeline. The cyclic replacement grouting process of the hole drilling fixing pipe has the beneficial effects that by adopting cyclic grouting, grouting is exchanged for one time through the grouting pipeline and the slurry return pipeline, so that slurry in a hole is evenly distributed, then through the process that the thin slurry is cyclically replaced by the thick slurry, so that the slurry in the hole is replaced from the normal ratio slurry into the thick slurry, the influence of shrinkage after cement consolidation is avoided, and a blank zone is avoided.
Owner:HUAINAN MINING IND GRP

Novel magnesium oxysulfate cement-based fireproof coating and preparation and application methods thereof

ActiveCN109133841AAvoid breakingLow thermal conductivityFiberUltraviolet
The invention relates to novel magnesium oxysulfate cement-based fireproof coating. The fireproof coating is hysteretic in foaming after coating. The surface drying time of the fireproof coating is 80-360 minutes, the fire-resistant time of the fireproof coating is 120-160 minutes, the softening coefficient of the fireproof coating is 0.8-0.9, and the heat conductivity coefficient of the fireproofcoating is 0.08-0.20W/m<2>*K. The fireproof coating comprises, by weight, 30-60 parts of low-grade light calcined magnesium oxide powder, 10-30 parts of light aggregate, 15-30 parts of magnesium sulfate heptahydrate powder, 0.1-1 part of waterproof agent, 0.1-1 part of fiber, 0.1-10 parts of early strength agent, 1-5 parts of active metal foaming agent and the balance water. The novel magnesium oxysulfate cement-based fireproof coating has the advantages that the fireproof coating is low in heat conductivity coefficient, good in thermal stability, capable of preventing foam generated by physical and chemical foaming from breaking during spraying by using the hysteretic foaming technology and uniform in quality; the fireproof coating is good in corrosion resistance, high in safety performance, stable in quality, good in water resistance and high temperature resistance, good in ultraviolet resistance, long in service life and capable of satisfying safety fireproof requirements.
Owner:UNIV OF SCI & TECH LIAONING

Nuclear power plant solid waste processing system

ActiveCN103680661AEasy to moveIncrease usageRadioactive decontaminationLiquid wasteWaste processing
The invention provides a nuclear power plant solid waste processing system. The nuclear power plant solid waste processing system comprises a carrier, a cement tank, a lime tank, a waste liquid measuring tank, a waste resin measuring tank, a stirrer, a conveyor and a waste barrel, wherein the cement tank, the lime tank, the waste liquid measuring tank, the waste resin measuring tank, the stirrer, the conveyor and the waste barrel are arranged on the carrier, the cement tank is used for containing cement, the lime tank is used for containing lime, the waste liquid measuring tank is used for quantitatively containing waste liquid, the waste resin measuring tank is used for quantitatively containing waste resin, the stirrer is used for stirring and mixing cement, lime and waste resin with waste liquid to form a mixture, the conveyor is used for conveying cement and lime into the stirrer, and the waste barrel is used for containing the mixture. The discharge port of the cement tank and the discharge port of the lime tank are communicated with the feed port of the conveyor, the discharge port of the conveyor is communicated with the feed port of the stirrer, and the waste liquid measuring tank and the waste resin measuring tank are communicated with the feed port of the stirrer. The nuclear power plant solid waste processing system has the advantages of being convenient to move and improving the utilization rate.
Owner:中广核工程有限公司 +1

Reinforcement method for broken damage of power transmission and transformation reinforced concrete pole

InactiveCN107989392AMeet the fixLimit hoop tensile strainBuilding repairsElectric power transmissionTensile strain
The invention discloses a reinforcement method for broken damage of a power transmission and transformation reinforced concrete pole. After clearing away loose concrete at a broken place of the concrete pole, the broken power transmission and transformation reinforced concrete pole can be reinforced by electrification through the application of forming of a repairing concrete layer, installation of a pre-stressed steel pipe on the outer layer, crack sealing of the concrete pole, overall appearance corrosion protection, and the installation of a pre-stressed steel hoop; and the axial bearing capacity and the bending resistance of the concrete pole can be effectively reinforced, the repair of the large-area damaged cement pole can be fulfilled, and the tensile strain in the circumferential direction of a pre-stressed electric pole after bearing the axial load can be effectively limited, thereby limiting the expansion and formation of longitudinal cracks.
Owner:SHANDONG ELECTRIC POWER IND BOILER & PRESSURE VESSEL INSPECTION CENT CO LTD +2

Cultivation method of honeysuckle

InactiveCN103563599AMeasures uniqueEasy to implementHorticultureThree-dimensional spacePlant cultivation
The invention relates to a cultivation method of traditional Chinese medicinal materials, and in particular relates to a cultivation method of honeysuckle. The method comprises the following specific technical measures of cultivating by using grape type hanging tendrils, i.e., erecting corresponding concrete poles between cultivation ridges of the honeysuckle, pulling steel wires between the concrete poles to form a cultivation trellis, and drawing the honeysuckle branches and tendrils to the cultivation trellis to form a grape type hanging tendril planting cultivation mode; meanwhile, digging X-shaped fertilization furrows for applying solid nutrient liquid fertilizer between two plants between the cultivation ridges of the honeysuckle; applying the conventional fertilizer and additionally applying solid nutrient liquid fertilizer according to the conventional management method to realize proper water and fertilizer application and management and guarantee the high and stable yield of the honeysuckle. By implementing the method, the three-dimensional space can be fully utilized in the grape type hanging tendril planting cultivation mode, ventilation and transmittance are realized, high yield and quality of the honeysuckle are realized, and flower picking and trimming are also facilitated. The cultivation method is extremely suitable for large-scale intensive planting cultivation of the honeysuckle.
Owner:黄金利

Granite concrete pavior brick and its manufacturing method

InactiveCN102337715ANot easy to residueNot crushableSingle unit pavingsClimate change adaptationBrickMaterial resources
The invention discloses a granite concrete pavior brick and its manufacturing method. The method comprises the following steps: taking cement, mountain sand and broken stone as the bottom layer raw materials, taking cement, mountain sand and granite as the surface layer raw materials, then placing a double-layer die filled with surface layer mixed raw materials and bottom layer mixed raw materials into a 80 ton-110 ton of press machine for vibrating, pressurizing and forming to obtain the granite concrete pavior brick. The granite concrete pavior brick has the advantages of good wear resistance, high strength, uniform bearing, simple and fast construction, good draining performance, low cost and long service life. Comparing the tests under the same usage environment condition and same thickness of the brick, the service life of the granite concrete pavior brick is 2-3 times higher than that of a traditional concrete brick. And can be widely used for large load bearing roads, wharfs, squares, pavements, earth-retaining slopes, lawn roads and the like. Tests prove that the maintenance work is greatly reduced and the manpower and the material resources can be saved by using the pavior brick of the invention.
Owner:GUIZHOU CONSTR SCI RES & DESIGN INST OF CSCEC +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products