The present invention provides an unmanned aerial vehicle
transmission line inspection
work site planning safety distance test method. The method comprises: an unmanned aerial vehicle model placement step, arranging an unmanned aerial vehicle model at a preset distance position at the side or the lower portion of a
simulation transmission line; an
voltage applying step, switching on a power generator, and applying
voltage to the
simulation transmission line until the unmanned aerial vehicle model generates sporadic
discharge; and a recording step, recording the first
discharge voltage value of the unmanned aerial vehicle model which generates sporadic
discharge, and determining the preset distance as
a site planning safety distance between the unmanned aerial vehicle model and the
simulation transmission line under the first discharge voltage. The unmanned aerial vehicle transmission line inspection
work site planning safety distance test method provides data support for the unmanned aerial
vehicle inspection work through obtaining of the relation of the size and the material of the unmanned aerial vehicle model, the type and the size of the discharge voltage type and the
site planning safety distance so as to improve the reliability of the unmanned aerial
vehicle inspection work.