The invention discloses a
nuclear power plant emergency power source power supply test method and
system, the method is as follows: making a circuit
system in the pressure relief state; opening a
voltage stabilizer evacuation valve; providing main pump shaft seal water; dismantling a
cut-off valve element from a material replacing water tank to a high-pressure safety
injection pump inlet; presetting low pressure safety
injection pump outlet
valve opening degree; in the
reactor pressure vessel covered condition, triggering a safety injection
signal; starting a low pressure safety
injection pump to pressurize a high-pressure safety injection pump to take water from the material replacing water tank to injecting water into a circuit; and due to the dismantling of the
cut-off valve element from the material replacing water tank to a high-pressure safety injection pump inlet, flowing water from the low pressure safety injection pump outlet back to a low pressure safety injection pump inlet to form large flow circulation to star an emergency power source power supply test under full load conditions. The beneficial effects are that: the method can be performed without the
reactor pressure vessel cover opening condition, and is not limited by
test execution windows, other debugging work may not be restricted during the test period, and the debugging working period can be saved.