The invention discloses a double-span simply-supported inverted arch trestle
rapid construction method. An inverted arch second-liner operation trestle is in place, the steps of clearing the bottom ofthe surface of an inverted arch initial support, performing waterproof drainage construction of the inverted arch second liner, constructing inverted arch reinforcing steel bars, installing an inverted arch floating mold in place, installing an inverted arch end mold, installing a buried type water stopper in the inverted arch end, performing
model building on the inverted arch second liner, disassembling the inverted arch second-liner floating mold, disassembling the inverted second-liner end mold, installing an inverted arch backfilling formwork, performing inverted arch backfilling concrete maintenance, and moving the inverted arch second-liner inverted arch trestle to the next circular stage are sequentially executed; after the filled concrete strength reaches the demolding strength,the concrete can be moved to the next operation region. The tunnel second-liner construction quality is ensured, in traditional construction, half construction is adopted, and the tunnel inverted archconstruction progress is accelerated, so that an artificial construction gap exists between the inverted arch support and the second liner, damage is caused to waterproof materials, constructed steelbars and finished concrete at the constructed half side, the tunnel waterproof and drainage problem is affected, and the concrete integrity quality problem is affected.