Pipe pile guide hole construction method under boulder group geological condition
A technology of geological conditions and construction methods, applied in drilling equipment and methods, earthwork drilling, wellbore/well components, etc., can solve problems such as easily damaged machinery, hole collapse, etc., to avoid delays in construction period, reasonable structure, Avoid the effect of moving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0030] The technical scheme in the embodiment of the invention will be clearly and completely described below in combination with the attached drawings in the embodiment of the invention. Obviously, the described embodiments are only part of the embodiments of the invention, not all of the embodiments.
[0031] reference Figure 1-6 , the construction method of pipe pile leading hole under the geological conditions of boulder group includes the following steps:
[0032] Step 1: first conduct positioning measurement on the operation site according to the pre-designed construction drawing, and then mark the determined pile driving point;
[0033] Step 2. Put the DTH Drill in place, drive the DTH Drill to the marked construction site, and then assign a special person to command, and then adjust and position the DTH hammer, bit lamp and other accessories of the DTH Drill one by one;
[0034] Step 3: start the DTH Drill for drilling. In the process of drilling, the piston in the DTH cylind
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap