Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

5 results about "Groundwater" patented technology

Groundwater is the water present beneath Earth's surface in soil pore spaces and in the fractures of rock formations. A unit of rock or an unconsolidated deposit is called an aquifer when it can yield a usable quantity of water. The depth at which soil pore spaces or fractures and voids in rock become completely saturated with water is called the water table. Groundwater is recharged from the surface; it may discharge from the surface naturally at springs and seeps, and can form oases or wetlands. Groundwater is also often withdrawn for agricultural, municipal, and industrial use by constructing and operating extraction wells. The study of the distribution and movement of groundwater is hydrogeology, also called groundwater hydrology.

Preoxidized-composite electrolyzing method for removing arsenic in groundwater

A method to remove arsenic in underwater by preoxidation-combined electrolyzing relates to a method to remove arsenic from underwater, belonging to the technical field of water treatment. The present invention has solved the defect that more expensive pure nulvalent iron and slower corrosion speed of the pure nulvalent iron have limited the absorption of arsenic on the nulvalent iron. The present invention includes the following steps: the underwater containing arsenic is pre-oxidized by ozone, potassium ferrate, potassium permanganate, H2O2, photocatalysis oxidation reagent or Fenton reagent, thereby transferring As(III) to As(V). The water pre-oxidized passes through a filtering bed containing cast-iron scrap and carbon granules. The oxidizer left in the preoxidation section promotes the reaction of the step.
Owner:HARBIN INST OF TECH

Mine new energy comprehensive utilization system and control method thereof

The invention provides a mine new energy comprehensive utilization system and a control method thereof. The mine new energy comprehensive utilization system comprises a new energy collection module, aPLC, an energy utilization module and a heat-storage water tank; the new energy collection module is connected with the heat-storage water tank, and the heat-storage water tank is connected with theenergy utilization module; the new energy collection module comprises a groundwater heat collection unit; the groundwater heat collection unit comprises a well water pump, the well water pump is connected with a plate heat exchanger, the plate heat exchanger is connected with a first circulating pump, and the first circulating pump is connected with a first water source heat pump; the heat-storagewater tank is connected with the first water source heat pump; the energy utilization module comprises an air conditioner unit and a heating radiator unit; the heat-storage water tank is connected with an air conditioner circulating pump and a secondary heating unit, the air conditioner circulating pump is connected with the air conditioner unit, the secondary heating unit is connected with the heating radiator unit, and the heating radiator unit is further connected with the heat-storage water tank; and the PLC is connected with the heat-storage water tank, the well water pump, the first circulating pump, the first water source heat pump, the air conditioner circulating pump and the secondary heating unit.
Owner:SHANDONG DONGSHAN MINING CO LTD ZHU BAI COAL MINING

Supersonic wave monitoring system used for real-time control of sand pile quality and method thereof

PendingCN107884311AReal-time monitoring of sound velocityReal-time monitoring of real-time densityAnalysing solids using sonic/ultrasonic/infrasonic wavesSpecific gravity measurementImmersed tubeSteel casing pipe
The invention discloses a supersonic wave monitoring system used for real-time control of sand pile quality and a method thereof. A scheme is mainly formed by a supersonic wave monitoring device and asand pile immersed tube steel casing pipe, the supersonic wave monitoring device uses supersonic wave for real-time monitoring of a sound wave propagation speed of a sand column in a lower part of the sand pile immersed tube steel casing pipe, and compactness of the sand pile can be evaluated according to the sound wave propagation speed. Through real-time monitoring of wave velocity change conditions during a sand pile construction process, and subsequent construction of the sand pile is guided. The scheme is not influenced by underground water and soil environment, the supersonic wave monitoring system has excellent signal anti-interference capability, supersonic wave monitoring can realize real-time monitoring of acoustic velocity of each sand pile during the sand pile construction process, compactness of the sand pile realizes real-time monitoring, the sand pile quality control is increased to a construction phase, moulding quality of each sand pile is ensured, reworking problem of the sand pile can be avoided, and a construction period is saved.
Owner:CHINA STATE CONSTR HARBOR CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products