Overall hoisted prefabricated underground continuous wall structure and prefabricating and construction method thereof

An underground diaphragm wall and hoisting technology, which is applied to underwater structures, infrastructure engineering, artificial islands, etc., can solve the problems of reducing the waterproof function of underground diaphragm walls, easy cracking and damage at joints, and small roots of mortise joints. Achieve the effects of shortening the construction period, facilitating subsequent processing, and improving strength

Inactive Publication Date: 2018-06-05
SHANGHAI APPLIED TECHNOLOGIES COLLEGE
View PDF13 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the root of this kind of mortise joint is small, and the relative rotation between the walls is easy to occur and cannot withstand large lateral earth pressure. The joint is easy to crack and damage, resulting in leakage at the joint
In order to prevent the concrete of the prefabricated undergroun

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0030] The present invention will be further described below in conjunction with specific embodiments and accompanying drawings, so as to help understand the content of the present invention.

[0031] like figure 1 As shown, it is a structural schematic diagram of an integral hoisting prefabricated underground diaphragm wall body provided by the present invention. It includes a prefabricated underground diaphragm wall body 2, the two ends of the prefabricated underground diaphragm wall body 2 are correspondingly provided with mortise joints 4, and the two sides of the wall body at the butt joint of the prefabricated underground diaphragm wall are respectively provided with water stop grooves 7. The water-swellable rubber water-stop strip 1 is provided in the water-stop groove 7 . The water-swellable rubber water-stop strip 1 can swell three times in volume after being exposed to water, and can fully fill the gap of the water-stop joint 5, and has an excellent waterproof effect.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention discloses an overall hoisted prefabricated underground continuous wall structure and a prefabricating and construction method thereof. The overall hoisted prefabricated underground continuous wall structure comprises a prefabricated underground continuous wall body, joggling joints are correspondingly arranged at both ends of the prefabricated underground continuous wall body, and sealing grooves are formed respectively in the two sides of the wall body at the butt joint portion of a prefabricated underground continuous wall and are internally provided with water-swelling rubbersealing strips. The butt joint portion of the prefabricated underground continuous wall body is provided with a waterproof joggling structure, the strength is high, slide and dislocation occurring between the wall bodies can be effectively prevented, the waterproof function is achieved, and concrete cracking can be prevented; prestress steel bars are arranged at the two sides of the wall body, thestrength of the wall body can be improved, and the wall body is prevented from being damaged in the transportation process; the steel bars are reserved at the top of the wall body and facilitate subsequent machining; besides, the prefabricated underground continuous wall is prefabricated integrally, concrete pouring is not required later, and a crane is adopted for hoisting and assembly in the construction process, which helps to shorten the construction period.

Description

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Owner SHANGHAI APPLIED TECHNOLOGIES COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products