Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

37results about "Artificial islands" patented technology

Elastic self slope type floating ice protection device

InactiveCN106958193AAvoid direct contactReduce Ice Cream VibrationArtificial islandsBridge structural detailsHinge jointEngineering
The invention provides an elastic self slope type floating ice protection device. The purpose of the elastic self slope type floating ice protection device is to reduce ice-induced vibration of a protection structure effectively, at the same time, control inclination angles of action surfaces, achieve bending failures of ice sheets, and achieve protection effects of icing disasters at different water levels. The elastic self slope type floating ice protection device is composed of a faceplate, a base plate, a beam, an upper cross bar, a lower cross bar, an upper cross bar spring, a lower cross bar spring, connecting nuts, hollow bolts, limiting nuts, faceplate slide grooves, hinged joints and trusses. According to the elastic self slope type floating ice protection device, the faceplate and the beam form a slope type protection structure capable of changing angles, and the faceplate, the springs, the upper / lower cross bar and the hollow bolts form an energy dissipation system. The purpose of adapting to changes of water levels of protection water areas and controlling the inclination angle of the faceplate through selections of design parameters can be achieved. By combining common characteristics of an elastic energy dissipation device and an inclined-plane floating ice protection device, the elastic self slope type floating ice protection device is suitable for structures of large-scale cofferdams, construction work platforms, bridge foundations and the like.
Owner:NORTHEAST FORESTRY UNIVERSITY

Pile leg and pile shoe sealing method used when self-elevating drilling platform enters water

The invention discloses a pile leg and pile shoe sealing method used when a self-elevating drilling platform enters the water. According to traditional domestic and international methods, when a platform for slipway construction enters the water, pile legs and pile shoes need to be elevated in place and locked after a lifting device and a locking device of the platform are well installed and debugged. According to the method, certain devices, namely a locking tool and a connecting steel channel are adopted for pile leg and pile shoe sealing. The locking tool is composed of three parts, namely a base side sealing pier, an inner side sealing pier and a high-strength bolt. The locking tool is in the shape of a boot and seals racks of pile legs inside the boot tightly. The locking tool is obtained through steel plate welding. In installation, the locking tool is welded to other structures of the platform to lock the pile legs inside through bolts. Pile shoes are sealed though the steel channel and a main ship body of the platform. The tool is simple in structure, safe and reliable. Practical application proves that the method is remarkable in effect.
Owner:DALIAN SHIPBUILDING IND OFFSHORE CO LTD

Dry cabin for maintaining underwater joint of jacket and mounting method of dry cabin

ActiveCN105019418AGuaranteed continuous useEasy maintenanceArtificial islandsUnderwater structuresUnderwaterEngineering
The invention relates to a dry cabin for maintaining an underwater joint of a jacket and a mounting method of the dry cabin. The dry cabin comprises a cabin body and an access way communicated with an inner cavity of the cabin body. The cabin body comprises at least two split cabin sheets capable of being separated from each other, and the split cabin sheets are spliced to form the cabin body. Splicing lines of the split cabin sheets are in sealing fit, and two first sleeve holes used for matching circumferential rings of the outer walls of the two ends of a pile leg respectively and a second sleeve hole used for matching the circumferential ring of the outer wall of the jacket are formed in the splicing lines. The first sleeve holes are in sealing fit with the pile leg, and the second sleeve hole is in sealing fit with the jacket. The access way upwards extends out of a water surface. The dry cabin can be mounted underwater in a spliced mode, and the underwater joint is isolated from the outside, so that the sealing performance of the internal part and the external part of the cabin body is guaranteed. After water in the cabin body is pumped out, the water can enter the cabin body from the access way to maintain the underwater joint, and maintenance is easier. Meanwhile, the interior of the cabin is in a normal pressure state, so that the repairability of the underwater joint is improved, the jacket is continuously utilized, and cost is reduced.
Owner:SHENZHEN OFFSHORE OIL ENG UNDERWATER TECH CO LTD

Construction method based on box-drum-type pile stabilizing platform

PendingCN110644487ASimple structureImprove horizontal bearing capacityArtificial islandsUnderwater structuresStable statusArchitectural engineering
The invention discloses a construction method based on a box-drum-type pile stabilizing platform. The construction method comprises the following steps that sequentially, the pile stabilizing platformassembled by a box drum, a steel pipe, a fixed truss and a moving truss is dragged to a construction site, synchronous and identical-speed air pumping is conducted on the box drum for fixing the pilestabilizing platform, the moving truss is lifted upwards to above the surface of the water and then fixed, a piling frame and a pile holding device are mounted on the moving truss, and a steel pipe pile with the large diameter is hoisted into the pile holding device; and an ejecting device on the pile holding device is used to adjust the perpendicularity, the steel pipe pile with the large diameter enters into the stable state after sinking into mud, pile sinking is conducted to the design elevation position, the pile stabilizing platform is moved, and the processes are repeated until the construction is completed. The construction method based on the box-drum-type pile stabilizing platform is simple in operation, the pile stabilizing platform adopted in the construction process is simplein structure, the horizontal carrying capacity and construction efficiency of the box-drum-type pile stabilizing platform are greatly improved, the construction quality of the steel pipe pile with the large diameter can be further ensured effectively, and the construction method is suitable for the construction of the steel pipe pile with the large diameter under different water depth and geological conditions.
Owner:天津港航工程有限公司

Building construction method adopting stepwise implementation of forward construction and reverse construction

InactiveCN111485578AImprove ventilationOptimizationArtificial islandsUnderwater structuresSupporting systemArchitectural engineering
A building construction method adopting stepwise implementation of forward construction and reverse construction comprises the following steps: S1, carrying out the reverse construction on vertical support members of a peripheral reverse construction area; S2, using the reverse construction method to carry out construction in the peripheral reverse construction area and manufacture horizontal support members of structural beams and slabs, so that a closed-loop horizontal support system is formed on the periphery of a main building; S3, reserving back pressure earth in the peripheral reverse construction area according to pit deformation requirements, and carrying out excavation on a main building area to reach a base through multistage sloping; and S4, carrying out the forward constructionon a main building area structure, and simultaneously carrying out upward construction on the main building and downward reverse construction on an underground structure of a reserved earth sloping area on the periphery of the main building after beam and slab structures of different floors, which are achieved through the forward construction of the main building, are integrated with beam and slab structures of the different floors, which are achieved through the corresponding peripheral reverse construction. The method provided by the invention has the advantages that the temporary support engineering amount can be greatly reduced, the excavation efficiency can be improved, and the construction progress can be greatly accelerated; and in the peripheral reverse construction stage, a large-space opening in the main building forward construction area is achieved, so that the ventilation and daylighting conditions of underground construction can be remarkably improved.
Owner:ANHUI INST OF BUILDING RES & DESIGN

Composite structure with bracing soldier piles and basement exterior wall overlapped and construction process of composite structure

InactiveCN110593312AReduce deformation differenceUnified deformation traitsArtificial islandsCellarsBasementEngineering
The invention discloses a composite structure with bracing soldier piles and a basement exterior wall overlapped and a construction process of the composite structure. The bracing soldier piles are arranged in a column manner at equal intervals and are closely attached to the outer side of the basement exterior wall, after concrete is poured into the clearances between embedded horizontal reinforcement in pile bodies of the bracing soldier piles and the soldier piles, a continuous overall pile wall is formed, and a shear force groove is formed in the pile wall. After the surface of the pile wall is scabbled and cleaned up, the bracing soldier piles and the basement exterior wall are connected to form overlapped connection through the shear force groove in the pile wall and reinforcement connectors in the bracing soldier piles, and thus the composite structure for resisting external water and soil pressure together is formed. According to the composite structure, the horizontal stiffness and bending resistance of the bracing soldier piles can be fully utilized, the bracing soldier piles and the basement exterior wall are combined, so that a temporary bracing structure becomes one part of a permanent underground main structure, then stress of the basement exterior wall is relieved, the thickness of the basement exterior wall is reduced, the usable area of a basement is increased,and social resources are saved.
Owner:NANTONG UNIVERSITY

Construction method for existing supporting system connected into subway in complex geology and environment

ActiveCN105155578AImprove adaptabilityReasonable useArtificial islandsUnderwater structuresSupporting systemAngular point
The invention discloses a construction method for an existing supporting system connected into a subway in the complex geology and environment. The construction method comprises the following steps that a point is selected from an underground diaphragm wall system to be built as a first axis point, and two intersecting surfaces of an original underground diaphragm wall supporting system of an original subway station and the underground diaphragm wall system to be built are set; a new underground diaphragm wall is built from the first axis point to the first connection surface to form a closed structure; an angular point closest to the first connection surface and the second connection surface is selected from the closed structure as a second axis point, and then two rows of third three-axis mixing piles are driven on the left side and the right side of a set third new underground diaphragm wall to be built from the second axis point to the second connection surface; and cement is poured into the spaces among first three-axis mixing piles, second three-axis mixing piles and the third three-axis mixing piles in sequence to form the first new underground diaphragm wall, the second new underground diaphragm wall and the third new underground diaphragm wall. By means of the method, the structural stability and the waterproof effect are improved.
Owner:CHINA CONSTR SIXTH ENG BUREAU CIVILENG +1

Anti-scouring system and method for pile foundation of offshore wind power

PendingCN113202129AReduce flow rateIncrease flow resistanceArtificial islandsClimate change adaptationWater flowStructural engineering
The invention discloses an anti-scouring system and method for a pile foundation of offshore wind power. The anti-scouring system for the pile foundation of the offshore wind power comprises a slope section system, a top section system and a three-dimensional supporting structure, wherein the three-dimensional supporting structure is trapezoidal and comprises a base, a top horizontal surface and an inclined slope surface, and the inclined slope surface is connected with the base and the top horizontal surface; the slope section system and the top section system are each of a grid structure, the grid system is composed of grids and stand columns, and each grid is vertically fixed by two stand columns; the vertical slope section system is arranged on the inclined slope surface, and the vertical top section system is arranged on the top horizontal surface. According to the anti-scouring system for the pile foundation of the offshore wind power, through a multi-layer grid structure, the water flow velocity is slowed down, and silt close to the bottom layer of a seabed is blocked; through the inclined slope surface of the three-dimensional supporting structure, the flow resistance is further increased, and the water flow speed is reduced; through the combination of the three-dimensional supporting structure and the grid structure, the seabed roughness is remarkably increased, the water flow speed is reduced, and the foundation anti-scouring purpose is achieved.
Owner:HUANENG CLEAN ENERGY RES INST

Locking mechanism for prefabricating underground continuous walls

PendingCN110939126APrevent disengagementImprove tensile propertiesArtificial islandsUnderwater structuresSlurry wallClassical mechanics
The invention relates to the field of underground continuous wall structures, in particular to a locking mechanism for prefabricating underground continuous walls. The locking mechanism is provided with an active inserting assembly and a passive inserted assembly. A locking connector of the active inserting assembly can slide along a guide rail under driving of a drive device, and thus the lockingconnector can move toward the outer side of a first prefabricated underground continuous wall in the horizontal direction. An anti-falling part is movably arranged in a locking inserting groove of the passive inserted assembly. After the first prefabricated underground continuous wall and a second prefabricated underground continuous wall are arranged horizontally next to each other, the lockingconnector extends into the locking inserting groove of the second prefabricated underground continuous wall, the anti-falling part is connected to the locking connector in an abutting-against manner so as to stop the locking connector from being separated from the locking inserting groove, the two adjacent prefabricated underground continuous walls can be connected rapidly, and the locking connector and the locking inserting groove can effectively improve the tensile property of the connecting portion of the underground continuous walls.
Owner:GUANGZHOU METRO DESIGN & RES INST

Edge protection safety bund system

ActiveUS20170130417A1Artificial islandsUnderground miningStructural engineeringProtective system
An edge protection safety bund system (10) for use in connection with a rock bund made of rock fill. The edge protection safety bund system (10) comprises a bund module (12) having a barrier wall (14) and a base plate (16). The bund module (12) is preferably one of a plurality of bund modules (12) arranged side by side to form an extended barrier wall (14). The barrier wall (14) of each module (12) extends substantially perpendicularly upwards from the base plate (16), and a support web (18) extends at an angle from a rear face of the barrier wall (14) to an upper surface of the base plate (16). In use, when rock fill is dumped onto the rear of the bund modules (12), and allowed to flow back to its natural angle of repose behind the barrier walls (14), it creates a rock bund (20) with a front face formed by the extended barrier wall (14).
Owner:HIRAM WA

Construction equipment of highway well lid peripheral concrete anti-cracking device

InactiveCN111622073AArtificial islandsUnderwater structuresHighway maintenanceStructural engineering
The invention provides construction equipment of a highway well lid peripheral concrete anti-cracking device, and belongs to the technical field of highway construction. The construction equipment ofthe highway well lid peripheral concrete anti-cracking device comprises a rack main body, a rotating assembly, a horizontal assembly, an angle assembly and a drilling and milling assembly, and is characterized in that a power head provides main drilling and milling power, a rotary worktable is fed at a low speed, vibration generated by high-speed rotation of equipment is reduced, the impact on concrete is mitigated, the cracking is reduced, the angle assembly adjusts the milling angle, a well lid mounting pit groove side wall inclined plane and a pit slot bottom boss are synchronously processed, concrete cracking caused by later polishing of an inclined plane angle is reduced, a vertical milling cutter divides the road well lid mounting groove, damage to the well lid mounting groove causedby subsequent hollowing is avoided, the risk of concrete breaking is reduced, one-time clamping and synchronous machining are achieved, the machining efficiency of the well lid mounting groove is improved, the risk of cracking of concrete around a well lid is reduced at the same time, road maintenance is more convenient, and the road maintenance quality is higher.
Owner:马槐苗

Soft geological foundation pit excavation construction method for existing line station

The invention relates to the technical field of foundation pit excavation construction, and provides a soft geological foundation pit excavation construction method of an existing line station. The soft geological foundation pit excavation construction method comprises the following steps that S1, construction is prepared; S2, a foundation pit to be excavated is monitored; S3, a main body of the station is excavated; S4, a steel support servo system is arranged on the main body of the station, construction monitoring is performed on excavation of the main body of the station through the steel support servo system, data is automatically monitored, a deformation rule is analyzed and automatic control is performed; and S5, the excavated foundation pit is subjected to leakage water stopping treatment. The construction efficiency of the foundation pit can be improved, the automatic monitoring effect is good, the construction safety is high, and the application range is wide.
Owner:CHINA RAILWAY NO 9 BUREAU GRP NO 1 CONSTR CO LTD

Adjustable conveying belt muck discharging method for high-slope-ratio entrance and exit channel

InactiveCN106608491AArtificial islandsConveyorsEngineeringSubway station
The invention discloses an adjustable conveying belt muck discharging method for a high-slope-ratio entrance and exit channel. Aiming at urban underground excavation subway stations complex in geological condition and peripheral pipelines, construction safety can be ensured better by excavating entrances and exits downwards, the construction risk is reduced, but if the entrances and the exits are subjected to downward excavation construction, muck is difficult to transport. According to the adjustable conveying belt muck discharging method for the high-slope-ratio entrance and exit channel, the problem that downward excavation construction of the entrances and the exits of a subway station is difficult to conduct is effectively solved by introducing an adjustable conveying belt; during construction, the problem that the high-slope-ratio entrance and exit channel is difficult in muck discharging is solved emphatically from the aspects of conveying belt type selecting, designing, machining, field installing, using and the like, and valuable experience is provided for downward excavation construction of more and more high-slope-ratio entrances and exits in the future; and through practice testing, the adjustable conveying belt muck discharging method is feasible, and the industrial problems which cannot be solved through existing technologies are solved.
Owner:CHINA RAILWAY NO 2 ENG GRP CO LTD +1

Pipe gallery segment installation construction system and method

InactiveCN113482046AImprove transport efficiencyImprove installation and construction efficiencyArtificial islandsTemporary pavingsArchitectural engineeringStructural engineering
The invention provides a pipe gallery segment installation construction system and method. The pipe gallery segment installation construction system comprises a foundation pit, first roads and second roads, wherein the first roads are arranged on the two sides of the foundation pit in the length direction of the foundation pit and used for supporting walking gallery lifting machines, the second roads are arranged on the sides, away from the foundation pit, of the first roads, the second roads are arranged in the length direction of the foundation pit and used for supporting walking gallery conveying vehicles, a third road is arranged between the two first roads, and the third road is arranged in the direction perpendicular to the length direction of the foundation pit and connected with the second roads. According to the pipe gallery segment installation construction system, conveying of the gallery conveying vehicles on the second roads is achieved, gallery lifting and transferring are conducted on the third road in cooperation with movement of the gallery lifting machines on the first roads, the position of the third road can be dismantled and then laid according to actual needs, the transferring and installing construction efficiency of a pipe gallery is improved, and the construction period is shortened.
Owner:NO 6 ENG CO LTD CCCC SECOND HIGHWAY ENG +1

Connection joint structure of prefabricated sandwich side wall and prefabricated laminated bottom plate and construction method of connection joint structure of prefabricated sandwich side wall and prefabricated laminated bottom plate

InactiveCN111173030AEffective waterproofGood strengthArtificial islandsProtective foundationArchitectural engineeringRebar
The invention specifically discloses a connection joint structure of a prefabricated sandwich side wall and a prefabricated laminated bottom plate and a construction method of the connection joint structure of the prefabricated sandwich side wall and the prefabricated laminated bottom plate. The connection joint structure comprises the prefabricated sandwich side wall arranged vertically and the prefabricated laminated bottom plate arranged horizontally below the prefabricated sandwich side wall, the prefabricated sandwich side wall includes an internal prefabricated plate and an external prefabricated plate, the internal prefabricated plate and the external prefabricated plate are connected through an erection truss between the internal prefabricated plate and the external prefabricated plate, and a horizontal water-stop steel plate is arranged in the middle of the bottom of the prefabricated sandwich side wall; embedded and extending U-shaped steel bars are arranged at both ends of the prefabricated laminated sandwich side wall, the U-shaped steel bars are arranged in a staggered mode in the height direction, and vertical stressed steel bars are arranged on the inner sides of theU-shaped steel bars; the prefabricated laminated bottom plate is a single-layer prefabricated plate, erection bars are arranged on the upper part of the prefabricated laminated bottom plate, and externally-extended L-shaped steel bars are arranged near the end parts of both ends of the side wall; and L-shaped reinforcing ribs are arranged at the corners of a joint of the prefabricated sandwich side wall and the prefabricated laminated bottom plate. The joint with a simple structure, reliable connection, reasonable stress and simple and convenient construction is provided, so that the overallstress performance of the connection joint structure is more superior.
Owner:SHANGHAI ERSHIYE CONSTR CO LTD +1

Composite ecological landscape fabricated retaining wall part prefabricating device and construction method

PendingCN113622460AReduce workloadProtect environmentArtificial islandsUnderwater structuresEnvironmental resource managementEcological environment
The invention discloses a composite ecological landscape fabricated retaining wall part prefabricating device and a construction method. The composite ecological landscape fabricated retaining wall part prefabricating device is characterized by comprising stand columns, a greening pool, a bottom plate, spiral corrugated holes, a water receiving table, a water permeable retaining plate, a cover plate and mortise and tenon structures, the greening pool is arranged above the bottom plate, the stand columns are arranged on the left side and the right side of the bottom plate, the vertical columns are provided with the mortise and tenon structures and the spiral corrugated holes, the water permeable soil retaining plate is arranged on the rear side of the bottom plate, the water receiving table is arranged on the rear side of the water permeable soil retaining plate, and the cover plate is located above the vertical columns. According to the composite ecological landscape fabricated retaining wall part prefabricating device, a prestress tensioning system is adopted, the masonry amount and invested funds are reduced, and green plants in a roadbed and the part can be protected through the greening pool and the water permeable soil retaining plate structure in the part; meanwhile, the ecological environment is further protected; and the fabricated retaining wall can be decomposed into various parts and can be assembled and constructed on site, and the construction efficiency is improved.
Owner:CCCC TUNNEL ENG

Pipeline laying and concrete structure in high-fall pipe well and construction method

PendingCN114382106APipe supportsArtificial islandsSteel tubeTube well
The invention discloses a pipeline laying and concrete structure in a high-fall pipe well and a construction method, and aims to solve the problem that a high-fall vertical shaft is small in space and personnel cannot enter the vertical shaft to install a pipeline and guarantee the safety of the personnel, the welding quality of the pipeline and the feasibility of a test scheme in the pipeline installation process. The structure comprises an upper equipment room, a lower equipment room, a high-fall vertical shaft and a plurality of water supply and drainage steel pipes, the water supply and drainage steel pipes are vertically arranged in the high-fall vertical shaft, and a backfill concrete structure is arranged in the high-fall vertical shaft. The construction method comprises the steps that firstly, an upper-layer equipment room and a lower-part equipment room are excavated, and a high-fall vertical shaft is excavated; hoisting water supply and drainage steel pipes; and the excavated high-fall vertical shaft is subjected to segmented concrete backfilling. When the fall of the pipe well exceeds a certain height, the pipe well can be divided into several sections of high-fall pipe wells, and similar or identical pipeline laying and concrete structures and construction methods are arranged.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Convenient to clean inspection well

PendingCN108589780AQuick installationQuick dismantlingArtificial islandsSewerage structuresHydrologyRetaining ring
The invention discloses a convenient to clean inspection well and relates to the technical field of inspection wells. The convenient to clean inspection well comprises a well foundation, a well bottom, a well body, a well lid base and a well lid, wherein a first sieve plate and a second sieve plate are fixed in the well body; the mesh of the first sieve plate is smaller than that of the second sieve plate; one end of the well body is fixedly connected with the top end of the well bottom through a connecting piece and a bolt; a plurality of first bulges, a plurality of second bulges and a plurality of sliding rails are uniformly fixed on the inner surface of the well body in an annular shape; the first bulges are positioned above the second bulges; and the first bulges, the second bulges and the sliding rails are distributed at intervals. According to the convenient to clean inspection well, the first sieve plate and the second sieve plate are arranged for screening, so that the situation that the well is blocked when larges-scale garbage, or pebbles or excessive sandy soil falls into the well is avoided; and through arranging a rectangular sliding block, a penetrating notch, a rectangular groove, a retaining ring, a safe hook, a nylon rope, a blocking ring and a flow guiding ring, the problems that the existing inspection well is likely to block and is inconvenient to clean aresolved.
Owner:JIANGYIN ZHONGCAI MOLDING

Soil retaining structure suitable for eliminating frost heaving effect in cold region and construction method

ActiveCN113529785ASlow down or eliminate frost heave deformationSlow down or eliminate frost heaving forceArtificial islandsProtective foundationFrost heavingRebar
The invention provides a soil retaining structure suitable for eliminating a frost heaving effect in a cold region and a construction method. The soil retaining structure comprises a slope protection backfill material, an EPS-containing mixed structure, a wall heel clay layer, a retaining wall, a drainage hole, a rigid pull rod and an anchoring plate; a through drainage hole is formed in the upper portion, the middle portion and the lower portion of the retaining wall body; the backfilling structure for eliminating the frost heaving effect is tightly attached to the wall back; the left ends of the rigid pull rods are embedded into the retaining wall, and the right ends of the rigid pull rods transversely penetrate through the EPS light soil to be connected with the anchoring plate in the soil embedded behind the wall; and the construction method comprises the following steps of construction preparation, foundation trench excavation and construction working face building, construction of the retaining wall and the backfill structure behind the wall, construction of the rigid pull rod and construction of the EPS-contained mixed structure. The structure is suitable for soil slope reinforcement engineering or high fill engineering needing to reduce or eliminate the frost heaving effect in infrastructure construction in the cold region, and has the advantages of being simple in structural form, easy and convenient to construct and low in engineering cost.
Owner:NANJING HYDRAULIC RES INST +1

Efficient well lid dismantling device

PendingCN114319451AArtificial islandsUnderwater structuresStructural engineeringClassical mechanics
The efficient well lid dismantling device comprises a stand column, a rotating column is rotationally connected to the rotating middle of the bottom end of the stand column, five rotating plates are slidably connected to the middle of the bottom end of the outer surface of the rotating column at equal intervals, and an electric telescopic column is welded to the middle of the top end of each rotating plate; a pentagonal strip plate is welded to the top end of an electric telescopic column, a cutting, crushing and taking mechanism is installed in the middle of the inner wall of one rotating plate, a crushing rotating disc and an outer cutting disc can rotate conveniently through a crushing rotating motor in the cutting, crushing and taking mechanism, and the rotating difficulty of the outer cutting disc and an inner cutting disc is reduced; and meanwhile, through cooperation of an inner cutting disc, an outer cutting disc, a hydraulic rod, a threaded rod and a connecting piece, the asphalt pavement on the edge of the well lid can be conveniently cut, the cutting difficulty of the asphalt road side is lowered, the cutting difficulty of the edge of the asphalt pavement of the well lid in the prior art is lowered, and meanwhile the phenomenon that the cutting discs make contact with the well lid is prevented.
Owner:青岛卓航睿智信息科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products