[0031] The present invention will be further described in detail below in conjunction with the drawings.
[0032] The invention discloses a tower crane full-model building construction method, including the following steps: S1, geological survey; S2, designing architectural drawings and pouring template drawings; S3, foundation construction; S4, building column beams and floor slabs; S5, assembling walls Formwork, forming a full wall model for a single floor; S6, building a tower crane; S7, hoisting the full wall model to the construction floor and installing the full wall model; S8, pouring the wall and curing the wall cement; S9, removing Full model of the wall.
[0033] Reference figure 1 The tower crane includes a fixed frame 1, a hanging form beam 2, a crane 3, a connecting block 4, and a mounting frame 5. The fixed frame 1 is formed by overlapping and fixing a steel frame, which is vertically arranged, and the bottom of the fixing frame 1 is fixedly installed on the ground . T
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap