Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

4 results about "Transfer station" patented technology

A transfer station is a building or processing site for the temporary deposition of waste, often called Waste Transfer Stations, or Material Recycling Facilities (MFU). Transfer stations are often used as places where local waste collection vehicles will deposit their waste cargo prior to loading into larger vehicles. These larger vehicles will transport the waste to the end point of disposal in an incinerator, landfill, or hazardous waste facility, or for recycling.

Method and system for controlling molten iron transportation

ActiveCN113084148AAchieve unique identificationAccurately identify job performanceMelt-holding vesselsCasting safety devicesProcess engineeringIndustrial engineering
The invention discloses a method and a system for controlling molten iron transportation, which are applied to the field of smelting. The method comprises the following steps that a tank matching plan of the current time of molten iron transportation is acquired, a molten iron tank car is selected according to the tank matching plan, and unique identification information of the molten iron tank car in the current operation period is generated; when the molten iron tank car runs to a first blast furnace and is empty during normal running, the molten iron tank car is confirmed according to the unique identification information, and iron is received from the first blast furnace to the molten iron tank car; iron number information of iron received by the molten iron tank car at the current time is generated, and distribution information of the molten iron tank car is generated according to the iron number information and the unique identification information; and when the molten iron tank car runs to a target tank transfer station and runs normally, the molten iron tank car is checked by using the distribution information. The method and system solve the technical problem that management and control over existing molten iron transportation are not facilitated.
Owner:武汉钢铁有限公司

Preparation method of aspergillus niger compound killing agent in municipal waste transfer station

InactiveCN113383800AReduce in quantityQuick snapBiocideFungicidesMonoglycerideFatty acid glycerol esters
The invention provides a preparation method of an aspergillus niger compound killing agent in a municipal waste transfer station, wherein the preparation method comprises clove essential oil, artemisia apiacea essential oil, tea tree essential oil, clove hydrolat, artemisia apiacea hydrolat, tea tree hydrolat, a lotus leaf extract, fatty acid monoglyceride, 1-hexadecyl-3-methylimidazolium chloride, 1-ethyl-3-methylimidazolium chloride and borneol. The plant essential oil contained in the aspergillus niger compound killing agent in the municipal waste transfer station contains various terpenoids, aldehydes, phenols and other natural organic small molecule compounds, has extremely strong bactericidal activity, has killing and long-term inhibition effects on aspergillus niger in the municipal waste transfer station, and reduces the number of bacteria; and meanwhile, due to the special aromatic odor of the plant essential oil, malodorous gas molecules released by the mould can be efficiently, rapidly and safely captured, adsorbed and controlled, and the malodorous odor and peculiar smell of the air can be well removed.
Owner:HONGHU LANTIAN ANHUAN ENERGY SAVING EQUIP

Comprehensive construction method for large-area prestressed pipe pile in existing open storage yard area

PendingCN113802555ASuppress upliftInhibition of lateral displacementBulkheads/pilesPre stressGreenhouse
The embodiment of the invention discloses a comprehensive construction method for a large-area prestressed pipe pile in an existing open storage yard area. The comprehensive construction method comprises the following steps that surface layer compact soil is treated before pile sinking construction of a pile foundation; the surface layer compact soil is treated before pile sinking construction of a terrace treatment pile; and pile sinking is carried out on a prestressed pipe pile. The pile sinking method comprises the following steps that a middle retaining wall and partition wall pile foundation area is firstly constructed through a pile hammering machine, and the pile hammering machine is driven in the direction from the axis of the center to the axis of the edge; the middle retaining wall and partition wall pile foundation area is constructed through the pile hammering machine; four pile hammering machines are used for constructing a material grid terrace treatment pile area; after the middle retaining wall and partition wall area pile foundation construction is completed, longitudinal low wall pile foundation areas on the east side and the west side start to be constructed; and finally, a greenhouse foundation pile foundation area and a matched transfer station foundation pile foundation area are constructed. The piling efficiency is improved, and the pile foundation construction quality is guaranteed.
Owner:CHINA MCC20 GRP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products