The invention belongs to the technical field of mine
coal mining
impact-prevention management, and particularly discloses a method for
impact prevention when a deep well thick
coal seam complicated geological condition multi-factor-coupled high-stress region passing connection roadways. The method includes the following steps that S1: repair of the connection roadway: repair and roof reinforcementwork is performed on the connection roadway in advance, and dinting and roof brushing are performed locally. By the aid of the method for
impact prevention when the deep well thick
coal seam complicated geological condition multi-factor-coupled high-stress region passing the connection roadways, the effective pressure-relief protection zone is formed in advance, the low-stress state of the working surface is guaranteed, the goaf side
abutment pressure influence is reduced, the low-stress state nearby the working surface is guaranteed, side coal body blasting is implemented 150 m before and behind two crossheading connection roadways, the coal body stress is reduced, deep large-
diameter pressure-relief holes are constructed in the connection roadways towards the working surface in advance,the pressure-relief holes are
cut through in advance, the
coal pillar stress between the connection roadways and the working surface is reduced, and
adhesive tape crossheadings of the working surfaceare all supported by fore supports for the first time.