Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

14 results about "Network topology" patented technology

Network topology is the arrangement of the elements (links, nodes, etc.) of a communication network. Network topology can be used to define or describe the arrangement of various types of telecommunication networks, including command and control radio networks, industrial fieldbusses and computer networks.

Method and system for establishing distribution network model

The invention relates to the technical field of distribution network models, and provides a method and a system for establishing a distribution network model. The method comprises the following steps: acquiring preset maintenance authorizations of the distribution network model; establishing a primary equipment model and a secondary equipment model in a range specified by the maintenance authorizations, and drawing a figure, wherein the secondary equipment model and the figure are respectively associated with the primary equipment model; according to the primary equipment model, the secondary equipment model and the figure which are associated, generating a network topology model; and informing other model maintenance modules to update network topology models respectively maintained by themselves according to the generated network topology model by using online modeling information. According to the invention, through acquiring the preset maintenance authorizations of the distribution network model, the correctness of a multi-people maintenance model can be ensured, thereby facilitating maintenance; and other model maintenance modules are informed to update network topology models respectively maintained by themselves according to the generated network topology model by using online modeling information, so that a power grid model is always consistent with an actual power-grid running model.
Owner:云谷技术(珠海)有限公司

Network topology construction method and device

ActiveCN108880844AEasy accessLow costData switching networksResource consumptionNetwork topology
The present invention discloses a network topology construction method comprising: collecting configuring information of a specified device in a network, and normalizing the configuring information, the configuring information at least including interface information and routing information; analyzing the interface information, and analyzing the routing information; and constructing a network topology map according to the interface information and the routing information. The present invention discloses a network topology construction device. The technical scheme can shield differences betweenmanufacturers' versions to reduce resource consumption.
Owner:ZTE CORP

Regional multi-microgrid dynamic networking method based on graph theory

InactiveCN107546773AImprove power supply reliabilityGood for the economySingle network parallel feeding arrangementsAlgorithmPower grid
The invention relates to a regional multi-microgrid dynamic networking method based on a graph theory. The regional multi-microgrid dynamic networking method is technically characterized by comprisingthe following steps that 1, according to a multi-objective function optimum in global economic operation and highest in system power supply reliability of an intra-regional multi-microgrid and presetconstraint conditions, an optimization model of a regional multi-microgrid is established; 2, a regional multi-microgrid dynamic networking model based on the graph theory is established by combiningwith network topology connection of a regional multi-microgrid system based on the regional multi-microgrid optimization model established in the step 1; 3, an improved particle swarm algorithm is adopted to solve the regional multi-microgrid dynamic networking model based on the graph theory, and dynamic networking of the regional multi-microgrid is achieved. By combining with interconnection and intercommunication characteristics of the regional multi-microgrid and power output constraint of the microgrid, the optimization model optimum in global economic operation and highest in system power supply reliability of the regional multi-microgrid is established, and a solution is provided for dynamic multi-microgrid networking in a regional range.
Owner:TIANJIN UNIV +1

GIS network topology structure based historic celebrity and event chronicling method

InactiveCN105740341AGeographical information databasesOther databases queryingNetwork connectionNetwork topology
The invention discloses a GIS network topology structure based historic celebrity and event chronicling method. The method comprises the following steps of determining to input names of various or interested historic celebrities and events; associating place information of the historic celebrities and events with a place name and address database; designing and organizing data structures of a historic celebrity element class, an important historic event element class, a small historic event element class, a small celebrity event association element class; constructing a network topology structure graph of historic celebrities and events; and through a graph theory and network connection analysis, obtaining GIS visualization based historic celebrity and event chronicles. According to the method, massive historic celebrity and event information can be integrated in a distributed network environment to realize intuitionistic, visual, convenient and quick historic celebrity and event GIS chronicles.
Owner:HUNAN UNIV OF SCI & TECH

Active power distribution network planning method based on big data technology

InactiveCN111582717AReduce the phenomenon of different planning sectionsAlleviate a weak situationResourcesInformation technology support systemData informationEngineering
The invention discloses an active power distribution network planning method based on a big data technology, and belongs to the field of intelligent power grid planning. The method comprises the following steps: fusing an initial database and power distribution network detection data, planning data fusion modes in different scenes, and planning node positions and scales in an active power distribution network by using the initial database; fusing various indexes with an electronic map by adopting a mature technical framework according to service index data, geographic space data and network topology data of the active power distribution network, and integrating the fused active power distribution network data; establishing the fused model, and solving the fused model; scheduling and configuring the known data, and establishing a data analysis library; establishing an effective index system, and carrying out comprehensive detection and abnormal motion detection. According to the invention, the active power distribution network is combined with big data to acquire sound data information, and the information is located at the same latitude; and an established effective index system isused for realizing comprehensive detection and abnormal change detection.
Owner:NANJING KAILONG POWER TECH CO LTD

Reinforced control cable

InactiveCN103440912AImprove flexibilityImprove recoverabilityCommunication cablesFlexible cablesInformatizationElectrical conductor
The invention discloses a reinforced control cable which comprises a cable core and an outer sheath. The cross section of the outer sheath is formed by combining the circular large end and the circular small end into a whole. The cable core formed by twisting and combining two insulated wire cores is wrapped with the large end of the outer sheath. A filling layer is arranged at a gap of the cable core. A shielding layer wraps the cable core in a winding mode. A reinforcing steel wire is arranged in the small end of the outer sheath and is parallel to the cable core. Each insulated wire core is composed of a conductor and an insulation layer; each conductor is formed by a plurality of anaerobic copper wires in a compound twisting mode, and one insulation layer wraps one conductor in an extrusion mode and is made of irradiation crosslinking or silane crosslinked polyethylene insulating materials. The reinforced control cable is reasonable and simple in structure, easy to produce and manufacture, low in cost and free of pollution, has high flexibility, restorability and tensile resistance, is compact and round in structure, safe to use and capable of completely meeting the performance requirement of complex required environment of current network topology and meeting the current informatization development demands, and has good environmental benefits and economic benefits.
Owner:JIANGSU XINFENG CABLE

Intelligent operating room system structure

ActiveCN105138815AExpanded surgical field of viewImprove operating precisionSpecial data processing applicationsControl systemStructural relation
An intelligent operating room system structure comprises a network topology structure, a control system structure, an information stream and function structure, wherein the network topology structure describes a structural relation between control systems; the control system structure describes internal compositions of the control systems; the information stream describes information stream directions in the control systems and between the control systems; and the function structure describes a main function of an intelligent operating room. According to the intelligent operating room system structure, visual operative field of a doctor is extended through a robot-assisted surgery technology, so that the operation precision and flexibility of the doctor are improved; medical personnel obtain, query and record related surgical information (including HIS, LIS and RIS information, a PACS image and the like of a patient) of the patient in real time; robot telesurgery and consultation based on medical image and surgical status image two-way transmission are realized; and by integration with a hospital information system, total digital affair management of a surgical department is realized.
Owner:SUZHOU ZOEZEN ROBOTICS CO LTD

Method and equipment for testing high reliability of storage equipment

InactiveCN112003762AImprove reliabilityVerify continuityData switching networksHigh availabilityDependability
The invention provides a method and equipment for testing high reliability of storage equipment. The method comprises the steps of: building a network topology of a storage environment and a host, andverifying whether IOPS in the storage environment is stable or not and whether output IO of the host is normal or not; in response to stable IOPS and normal host output IO in the storage environment,acquiring specific parameters of the storage environment and the host; drawing a first performance curve graph based on the obtained specific parameters; removing connection of a part of controllersin the storage environment, and acquiring specific parameters of the storage environment and the host again; drawing a second performance curve graph based on the re-obtained specific parameters, andcomparing the second performance curve graph with the first performance curve graph; and in response to consistency of fluctuations of the second performance curve graph and the first performance curve graph, judging that the storage equipment has high reliability. By using the method and the equipment provided by the invention, the high availability of multi-control storage can be verified, the continuity of host IO services when the storage is abnormal can be verified, and the competitiveness and commercial value of products in the market can be improved.
Owner:SUZHOU LANGCHAO INTELLIGENT TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products