Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

7 results about "Load capacity" patented technology

Warehouse Management & Equipment Glossary: Rated Load Capacity. Rated Load Capacity -The maximum load for which the equipment is designed by the manufacturer. Loading more product onto a rack than it is designed to handle could damage the structure and possibly lead to failure.

Openable skirt type steel reinforcement cage of reamed pile

The invention discloses an openable skirt type steel reinforcement cage of a reamed pile and belongs to piling building materials. According to the openable skirt type steel reinforcement cage, a reaming section of a pedestal pile has a horizontal expansion function, the reinforced concrete structure forms of the existing rotary expanding piles are changed, and the load capacity of the rotary expanding piles is increased; the steel reinforcement cage is unfolded at the bottom of a hole through a plurality of link mechanisms, the appearance of the unfolded steel reinforcement cage is basically similar to the contour of the reamed hole, the link mechanisms are simultaneously opened and are connected with an existing steel reinforcement cage through steel stranded wires, then, concrete is cast, the link mechanisms serve as steel reinforcement members, and thus, the strength of concrete members of rotary expanding pile bodies is enhanced.
Owner:XUZHOU LEHMAN MASCH TECH CO LTD

Bagged barium sulfate convenient transfer device in workshop

InactiveCN106395686AEasy to drag and runImprove efficiencyLifting devicesLifting gasEngineering
The invention discloses a bagged barium sulfate convenient transfer device in a workshop. Before working, operating personnel firstly place a freight frame on the upper side of a load-bearing seat body; the transfer device is consigned to the position near to-be transferred cargoes; gas in a lifting gas cylinder is released so that the height of the load-bearing seat body can be decreased; the to-be transferred bagged barium sulfate is placed on the freight frame by the operating personnel in a flat lying mode and gradually and continuously overlaid from inside to outside and from low to high till reaches the rated load capacity of a vehicle body; then a driving hand is pushed and pressed in a reciprocating mode so that gas can be inflated into the lifting gas cylinder, and thus the load-bearing seat body drives the cargoes to be ascended to the appropriate height; and the operating personnel consign the vehicle body to a target site through the driving hand, so that transport working is completed. According to the bagged barium sulfate convenient transfer device in the workshop, bagged barium sulfate crystals can be rapidly transferred to the designated site; the cargo capacity is large; control is flexible; the working efficiency of the device is high; and the physical effort of the operating personnel is reduced.
Owner:GUANGXI LIANZHUANG SCI & TECH CO LTD

Load importance-based three-stage topological operation optimization method

PendingCN114069689AImprove superiorityHigh feasibilityPower network operation systems integrationSingle network parallel feeding arrangementsSystem capacityIslanding
The load importance-based three-stage topological operation optimization method provided by the embodiment of the invention comprises the following steps: collecting power distribution network operation data after a fault, and establishing a topological structure for fault identification; establishing a load importance evaluation model according to the power-losing charge in the distribution network operation data; searching a distributed power generation device with adjustable power in the island area of the distribution network, and carrying out first-stage topological optimization; establishing a two-stage topological optimization model, and performing load transfer on the standby feeder line and the distributed power generation device; and after load transfer, if a target substation in an overload operation state still exists, establishing a secondary transfer model, and obtaining the optimal transfer load capacity of the target substation. The method can effectively process the decision of the optimal operation mode of the distribution topology under the fault, improves the power supply reliability of the power distribution network, can check and optimize the maintenance mode of the power distribution network, facilitates the regulation and control of the comprehensive analysis of the load of the cloud platform power distribution network, and also facilitates the optimal utilization of the system capacity of the power distribution network.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO LTD SHAOXING POWER SUPPLY CO +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products