Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

23 results about "Real-time data" patented technology

Real-time data (RTD) is information that is delivered immediately after collection. There is no delay in the timeliness of the information provided. Real-time data is often used for navigation or tracking. Such data is usually processed using real-time computing although it can also be stored for later or off-line data analysis.

Failure prediction method based on ICA reconstruction

ActiveCN102539192ASolve the problem of not being able to utilize multi-dimensional effective dataImprove forecast accuracySubsonic/sonic/ultrasonic wave measurementStructural/machines measurementReal-time dataAlgorithm
The invention discloses a failure prediction method based on ICA reconstruction, which includes the following steps: step 1, calculating a separative matrix W; step 2, calculating the statistic value I<2>(k), SPE(k) or I<2>e(k) of the real-time data Xnew(k) through adopting the formulas I<2>(k)=S'newd(k)<T> S'newd(k), I<2>e=S'newe(k)<T>*S'newe(k), SPE(k)=(xnew(k)-x'new(k))<T>*(xnew(k)-x'new(k)), S'newd(k)=Wd*xnew(k), and S'newe(k)=We*xnew(k), wherein Wd refers to the matrix formed by the lines expect the first d lines of the separative matrix W, We refers to the matrix formed by the lines except the first d lines of the separative matrix W, and X'new(k)=Q<-1>BdWd*xnew(k), Bd=(WdQ<-1>)<T>, Be=(WeQ<-1>)<T>, and Q refers to a whitening matrix; and step 3, calculating the nuclear density of I<2>(k), SPE(k) or I<2>e(k), and detecting failures as per the control limit. The method provided by the invention solves the problem that the traditional flue gas turbine prediction method can not utilize the multidimensional valid data, takes the multi-channel vibration data into consideration, can be used for directly predicating failures, and improves the prediction accuracy compared with the PCA reconstruction method.
Owner:BEIJING INFORMATION SCI & TECH UNIV

Data-mining-based method of fault-collecting early warning system

InactiveCN106503439APrevent wrong dischargeImprove troubleshooting efficiencyForecastingSpecial data processing applicationsEarly warning systemData stream
The invention relates to a data-mining-based method of a fault-collecting early warning system. The method includes the steps that accumulated fault data is processed, and a classifier is built; real-time data flow is processed through the classifier, and fault types are analyzed; an expert knowledge base is built; according to comparison of the fault types and the expert knowledge base, the result is obtained, a feedback mechanism is built in cooperation with feedback of maintenance persons, and the feedback result and the fault data are applied to building of the classifier. The method is intelligent and rapid, the running fault types can be accurately found, the technical support is provided for maintaining for collected faults, and the fault solving efficiency is improved.
Owner:STATE GRID FUJIAN ELECTRIC POWER CO LTD +4

Real-time task calculation control method, device, server and storage medium

InactiveCN110377429AImprove development efficiencyFast and efficient real-time data processingProgram initiation/switchingResource allocationReal-time dataData source
The invention discloses a real-time task calculation control method, a real-time task calculation control device, a server and a storage medium. The method comprises the steps of obtaining the information of a data source, and enabling the information of the data source to be configured and input through executing a first page; obtaining calculation result storage information after the data sourceis calculated, wherein the storage information is input by executing second page configuration; obtaining calculation logic formed by an SQL control chain based on a page, the SQL control chain configuring input by executing a third page, the SQL control chain comprising one or more controllable SQL controls based on the page, and the calculation logic being execution logic for calculating the data source; and packaging the information of the data source, the calculation result storage information and the calculation logic of the same real-time task into an executable file, and sending the executable file to a cluster system for running. According to the technical scheme, the effect of rapidly and efficiently completing real-time data processing through SQL control operation and SQL statement writing is achieved.
Owner:SHENZHEN LEXIN SOFTWARE TECH CO LTD

Fault diagnosis and online monitoring method for draught fan master control system based on data driving

ActiveCN106762452AFault monitoringImprove surveillance sensitivityEngine fuctionsMachines/enginesReal-time dataControl system
The invention discloses a fault diagnosis and online monitoring method for a draught fan master control system based on data driving, and belongs to the technical filed of fault diagnosis. The method comprises the steps of calculating control limits of normal data of the draught fan master control system; calculating statistical magnitude of fault data of the draught fan master control system; determining fault occurrence time T according to the relation between the statistical magnitude and the control limits and determining the variety contribution rate and the fault variety of each master control system in the collected fault data when determining the time T; calculating the signal to noise ratio, the number of principal elements and the statistical magnitude which correspond to the fault variety in real-time data of the draught fan master control system sequentially, wherein if the statistic magnitude is within the control limits, the draught fan master control system is normal in operating process, otherwise, a sensor which corresponds to the fault variety is adopted in a fault sensor. According to the fault diagnosis and online monitoring method for the draught fan master control system based on the data driving, the use of complicated modeling by mechanism and signal analysis of the draught fan is avoided; multiple faults in the same time frame can be monitored, and the fault capable of being found is multidimensional; the biggest signal to noise ratio is adopted to determine the number of the principal elements, and thus the monitoring sensitivity of the faults is improved.
Owner:NORTHEASTERN UNIV LIAONING

Method and system for remote accurate administration of integrated water and fertilizer

The present invention discloses a method and a system for remote accurate administration of integrated water and fertilizer. The method comprises the steps of: 1, acquiring real-time parameters of a farmland, wherein the farmland parameters include temperature value, humidity value, soil moisture value and flow rate value in an irrigation pipeline; step 2, sending the farmland parameters to a monitoring server through wireless network, calculating irrigation and fertilization strategy and generating an irrigation control signal and a fertilization control signal; and step 3, controlling the flow rate in the irrigation pipeline according to the irrigation control signal, and controlling the flow rate in the fertilization pipeline according to the fertilization control signal. The present invention utilizes wireless communication means to send real-time data of agricultural production site in time to the monitoring server side for data accumulation and remote monitoring on agricultural production site. The method and system guide fertilization and irrigation in agricultural production site, and in particular can achieve finely precise fertilization and irrigation.
Owner:CHINESE ACAD OF AGRI MECHANIZATION SCI +1

Intelligent front-end multimedia information acquisition system used for accurately monitoring power station equipment

PendingCN107885156AAccuracyIntegrityProgramme control in sequence/logic controllersData compressionPrivate network
The invention provides an intelligent front-end multimedia information acquisition system used for accurately monitoring power station equipment. The system comprises a plurality of groups of data acquisition devices arranged in a production area I. The data acquisition devices are connected with equipment systems in the production area I. The data acquisition devices are further connected with anintelligent front-end data server arranged in a production area II through a first one-way safety isolation device. The intelligent front-end data server is connected with a second one-way safety isolation device. The second one-way safety isolation device is connected with a cloud server arranged in a management information large area through a private network. The system does not perform the simple lossy compression on acquired real-time data, wherein the sampling frequency and the data compression are dynamically adjusted according to actual needs. Meanwhile, data acquired in real time arestored in a structured database, while data not acquired in real time are stored in a non-structured database. Moreover, the data acquired by the system has the advantages of accuracy, integrity andconsistency. The system is safe in data transmission and high in efficiency. The same coding rule is adopted, and the data application is more efficient, more convenient and more purposeful.
Owner:SHANGHAI POWER EQUIP RES INST

Method for processing power network monitoring device data

ActiveCN103955863AImprove developmentImprove reuse rateData processing applicationsManagement toolReal-time data
The invention discloses a method for processing power network monitoring device data. The method includes the following steps that firstly, according to requirements, Nk monitoring device model tables and Mk classes of monitoring device real-time data tables are regularly or periodically extracted to Nk temporary monitoring device model tables corresponding to an operation and maintenance management and control system and Mk classes of temporary monitoring device real-time data tables corresponding to the operation and maintenance management and control system; secondly, the Nk temporary monitoring device model tables are automatically assembled into monitoring device operation and maintenance model tables, and the Mk classes of temporary monitoring device real-time data tables are automatically assembled into monitoring device real-time operation and maintenance data tables; thirdly, according to a source professional system access data sequence, the content of all the monitoring device operation and maintenance model tables and the content of all the monitoring device operation and maintenance data tables are sequentially loaded to a power network monitoring device model table and a power network monitoring data table respectively; fourthly, the first step, the second step and the third step are combined into a scene, the scene is maintained through a TASK management tool, and then models and the data are updated. According to the method, the development cycle is shortened, and meanwhile stability of the system is guaranteed.
Owner:EXAMING & EXPERIMENTAL CENT OF ULTRAHIGH VOLTAGE POWER TRANSMISSION COMPANY CHINA SOUTHEN POWER GRID +1

Unreasonable oil consumption real-time alarm method and OBD vehicle-mounted terminal thereof

ActiveCN111483396AExtend your lifeIncreased willingness to install OBD terminalsSignalling/lighting devicesElectric/fluid circuitMicrocontrollerMicrocomputer
The invention discloses an unreasonable oil consumption real-time alarm method and an OBD vehicle-mounted terminal thereof, and belongs to the technical field of vehicle electronics. Whether the vehicle has unreasonable fuel consumption and fuel consumption reasons in the driving process or not is scientifically judged through real-time data such as the accelerator opening degree, the vehicle speed and the engine rotating speed according to the running principle of the diesel vehicle; and a driver is reminded through voices. The OBD vehicle-mounted terminal comprises a first CAN bus unit, a second CAN bus unit, a single-chip microcomputer including an unreasonable oil consumption real-time alarm program, a storage unit and an alarm prompt unit. And driving parameters are received from theOBD system of the diesel vehicle and transmitted to the single chip microcomputer, whether unreasonable oil consumption exists in the driving process or not is judged in real time, and the oil consumption per hundred kilometers is calculated. Besides, the single-chip microcomputer calls the corresponding voice file from the storage unit and informs the driver of the corresponding voice file through the alarm prompt unit to prompt the driver to change the driving behavior, and unreasonable oil consumption is avoided.
Owner:HANGZHOU QIZHEN TECH CO LTD

Electric appliance safety early warning system and control method

PendingCN113848761AKeep abreast of the operation statusMonitor temperature in real timeMeasurement devicesProgramme control in sequence/logic controllersControl cellElectric equipment
The invention relates to the technical field of electric appliance safety maintenance, in particular to an electric appliance safety early warning system which comprises a monitoring unit, a communication unit, a cloud platform, a control unit and an early warning display unit. The monitoring unit is used for continuously monitoring monitoring points in the electrical appliance equipment in real time; the communication unit is connected with the monitoring unit, the cloud platform, the control unit and the early warning display unit, the control unit comprises an imaging module and an early warning judgment module, the imaging module is used for converting real-time data into image signals; the early warning judgment module is used for storing a threshold value interval, comparing the real-time data with the stored threshold value interval, and according to a comparison result, judging whether an early warning signal is sent; and the early warning display unit is used for outputting the early warning signal. The system has the beneficial effects that due to the automatic monitoring and early warning functions, production halt and major accidents caused by equipment faults are effectively avoided, and the management and the maintenance cost of electrical equipment is greatly reduced.
Owner:SHANGHAI JISHEN INTELLIGENT TECH CO LTD

Power grid dispatching exception handling auxiliary decision-making method

ActiveCN110909945AImplement load analysisRealize intelligent generationForecastingResourcesReal-time dataPower grid
The invention discloses a power grid dispatching exception handling auxiliary decision-making method, which comprises the following steps: obtaining historical data of a power grid, predicting a powergrid load according to the historical data, and formulating an emergency mechanism according to a prediction result; setting preferences of a power grid prediction result in different time periods, and performing risk prompting according to the preferences of the prediction result; and acquiring real-time data of the power grid, and generating a load transfer and power grid power restoration scheme as a reference scheme of a dispatcher according to the real-time data of the power grid. According to the power grid dispatching exception handling auxiliary decision-making method, power grid loadanalysis can be realized; precontrol measures are taken for heavy-load equipment; real-time power grid risk analysis can be achieved; risks in different time periods are revealed; the power grid dispatching exception handling auxiliary decision-making method is more efficient and comprehensive than existing manual analysis; and in addition, intelligent generation of a load transfer scheme and automatic generation of a bus no-voltage power restoration scheme can be achieved, and the workload of plan writing of a dispatcher is reduced to a certain degree.
Owner:GUANGDONG POWER GRID CO LTD +1

Gas heat value soft measurement method based on air and gas double-preheating

ActiveCN109655487ASolve the inconvenienceSolve problemsMaterial heat developmentComplex mathematical operationsCombustion systemReal-time data
The invention provides a gas heat value soft measurement method based on air and gas double-preheating. The soft measurement method comprises the steps of obtaining real-time data of a combustion system operation parameter; performing preprocessing on the acquired data, and obtaining effective data for solving the gas heat value; and according to the acquired effective data, calculating a gas drybase heat value. According to the method of the invention, the gas dry base heat value is indirectly calculated through a relation between a dry air amount and the gas heat value. The method is suitable for combustion equipment in which pure burning of blast furnace gas or converter gas and air and gas double-preheating technology are utilized. A calculating result can be used for guiding combustion optimization adjustment of the combustion equipment, thereby supplying a basis for safe and economic operation of the combustion equipment. The gas heat value soft measurement method can settle inconvenience and a difficulty in combustion equipment operation caused by no gas heat value online analyzer in a majority of steel plant gas combustion systems, and furthermore has high engineering value.
Owner:JIANGSU MARITIME INST

Force reading devices and methods

ActiveUS20200383575A1Body weightMore evenly distribute their limbsDiagnostics using pressureForce measurementMobile appsPhysical medicine and rehabilitation
The present disclosure relates to force reading device. The products are multi-sensor, meaning they operate using two or more independent sensors, and communicate weight distribution and force data to the user in real time. The weight-lifter / user is notified by a visual aid via mobile app display and / or LCD screen and verbal feedback. Through real-time data feedback, the user is able to correct their form / balance as needed, in efforts to center their body weight and / or more evenly distribute their limbs. This in turn allows for the collection of data on how one may perform exercises and job tasks, and also offers a real-time solution for preventing injury and increasing exercise / job task functionality.
Owner:AEGLE BIOTECH LLC

Property management system based on data linkage

InactiveCN111985759AAvoid deficienciesAvoid wastingOffice automationResourcesUser needsReal-time data
The invention relates to a property management system based on data linkage. The property management system based on data linkage comprises a background management platform and a mobile user side, themobile user side at least comprises a clock-in sign-in module and a scheduling module, and the background management platform at least comprises a sign-in management module and a scheduling management module which can be in real-time data linkage with scheduling information of a mobile front end; the sign-in management module is used for setting a plurality of clock-in modes according to user requirements, so that the property management personnel can conveniently carry out clock-in and fixed-point opening according to actual conditions; the scheduling management module adds rules in a user-defined mode according to a rule model, ensures regularity of scheduling man-hours of property management personnel and avoids irrationality of scheduling among posts and personnel conflicts.
Owner:BEIJING WALKERS TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products