The invention provides a production
scheduling system and a method thereof. The
system consists of a terminal of a
production planning department, a
server and a
database for storing historical data. The terminal of the
production planning department acquires and finishes data real-timely from the connected information terminals through the
server. An order is coded through a
genetic algorithm basing on an elite hydrolytic tank. Then, genetic operations such as selective transposition, etc., which are executed and evaluated and optimized layer by layer are implemented to generate an optimal
production schedule. Finally, a production scheduling proposal is transferred to a production workshop through the
server and feedback data on a
processing field are real-timely received for the proposal regulation. The hardware environment of the
system can be easily realized, the method of the
system combines with a
heuristic rule and the
genetic algorithm, thus the system of the invention improves the solving result and the operation speed during the solving of the scheduling proposal under the condition that a large number of orders, a multilayer structure and the complex process are provided. The production
scheduling system and the method of the invention has the advantages of wide application range, strong expandable type, fast operation speed, good optimal performance, etc.