Construction method capable of quickly dismantling building component
A technology of building components and construction methods, which is applied in the direction of building structure, construction, building maintenance, etc., can solve the problems of long hoisting equipment occupation time, high clearance requirements, poor applicability, etc., and achieve a green and healthy working environment with a high degree of integration , Improve the effect of construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0047] Example one
[0048] figure 1 The integrated construction equipment for fixing, cutting and transportation of building components is introduced. The construction equipment can dismantle building beams, shear walls and other building components. Specifically, the construction equipment includes a walking device 1, a turning device 4 arranged above the walking device 1, and a robotic arm 5 mounted on the turning device 4. The fixing device 6 in the present invention is provided at the front end of the robotic arm 5. The walking device 1 is located on the working surface 7, which can be a floor slab, and the fixing device 6 is used to dismantle the building component 8. figure 1 The middle building component 8 is a shear wall, and of course the building component can also be a beam-slab structure. The construction equipment may also include a number of supporting feet 2, which can be connected to the frame of the walking device 1 through a balance arm 3, and are used to support
Example Embodiment
[0059] Example two
[0060] This embodiment provides a construction method for rapid dismantling of building components, using the integrated construction equipment for fixing, cutting, and transporting building components in the first embodiment to dismantle the building components. The following is combined with the first embodiment and the appendix Figure 1 to 4 To further describe the dismantling method, the dismantling method specifically includes the following steps:
[0061] The integrated construction equipment for fixing, cutting and transportation of building components is walking in place, and the small hand-held drilling device is used to complete the cutting and pilot hole work on the building components to prepare for the next step to penetrate the wire saw chain;
[0062] After adjusting the mechanical arm 5 to make the fixing device 6 in place, keep the retractable fixing pin 63 in the retracted state, and adjust the mechanical arm 5 to make the fixing device 6 close to
Example Embodiment
[0068] Example three
[0069] Because the construction site often encounters obstacles, the integrated construction equipment for fixing, cutting, and transporting building components provided in this embodiment has an obstacle overturning function, and the main purpose is to improve the walking device in the first embodiment. Combine Figure 5 with Image 6 As shown, the walking device includes a chassis 11 and a walking mechanism 12 arranged on both sides of the chassis 11. The walking mechanism 12 includes a first roller 13, a second roller 14, an adjusting flywheel 15, a crawler belt 16, a first lifting wheel system 17 and a second lifting wheel system 18; the first roller 13, the first lifting wheel system 17 The second lifting wheel system 18 and the second roller 14 are sequentially arranged on the chassis 11; the adjusting flywheel 15 is located at one end of the connecting rod 19, and the other end of the connecting rod 19 is fixed on the chassis 11 and can be wound around
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap