A power station, also referred to as a power plant or powerhouse and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Most power stations contain one or more generators, a rotating machine that converts mechanical power into three-phase electric power. The relative motion between a magnetic field and a conductor creates an electric current. The energy source harnessed to turn the generator varies widely. Most power stations in the world burn fossil fuels such as coal, oil, and natural gas to generate electricity. Cleaner sources include nuclear power, biogas and an increasing use of renewables such as solar, wind, wave and hydroelectric.

Method of chilling inlet air for gas turbines

InactiveUS20050056023A1Lower the average temperature of the chilling waterLower inlet temperatureClimate change adaptationEvaporators/condensersPower stationCooling coil
A method for cooling inlet air to a gas turbine is provided. For example, a method is described including passing inlet air through a cooling coil that includes an opening for receiving the inlet air and that is operably connected to a gas turbine power plant. The gas turbine power plant may include at least one gas turbine, and at least one gas turbine inlet which receives the inlet air. The method may further include passing circulating water through a water chiller at a first flow rate to reduce the temperature of the circulating water, the water chiller including a conduit through which the circulating water is capable of passing and passing the circulating water having the first flow rate through the cooling coil in an amount sufficient to lower the temperature of the inlet air. Additionally, the method may include reducing the flow rate of the circulating water passing through the water chiller, passing the circulating water through a water chiller at a second flow rate to reduce the temperature of the circulating water, the second flow rate being lower than the first flow rate, and passing the circulating water having the second flow rate through the cooling coil in an amount sufficient to lower the temperature of the inlet air.
Owner:TAS ENERGY +1

Method and circuit for controlling an electric power plant

InactiveUS20060132103A1High precisionEmergency protective circuit arrangementsDynamo-electric converter controlCapacitancePower station
A control circuit is for an electric power plant including an asynchronous generator of an AC voltage, a motor to rotate a rotor of the asynchronous generator as a function of a first control signal of a developed motor torque, and a bank of capacitors coupled to the asynchronous generator and having a total capacitance varying as function of a second control signal. The control circuit may include a monitor circuit to monitor at least one parameter of the AC voltage, and a control signal generator circuit cooperating with the monitor circuit to generate the first and second control signals by soft-computing techniques both as a function of the frequency and of a representative value of an amplitude of the AC voltage to make the AC voltage have a desired amplitude and frequency.
Owner:STMICROELECTRONICS SRL

Physical simulation test system for subsea production facility hydraulic control system

InactiveCN102425587ASimulation is accurateAccurate researchFluid-pressure actuator componentsPower stationControl system
The invention discloses a physical simulation test system for a subsea production facility hydraulic control system. The physical simulation test system comprises a hydraulic power station, a hyperbaric cabin, an oil supply umbilical pipe, a subsea distribution module, a subsea control module, an actuator module, an oil return umbilical pipe, and a hyperbaric cabin oil return pipe, wherein the hydraulic power station is connected with the hyperbaric cabin and the oil supply umbilical pipe through a hyperbaric cabin oil supply pipe respectively; the oil supply umbilical pipe is connected with an inlet of the subsea distribution module; an outlet of the subsea distribution module is connected with the subsea control module and the actuator module respectively; the actuator module is connected with the oil return umbilical pipe which is connected with the hyperbaric cabin oil return pipe; the hyperbaric cabin oil return pipe is connected with the hydraulic power station; and parts are connected so as to form the physical simulation test system for the hydraulic control system. By a test platform of the subsea production facility hydraulic control system, the simulation and research of the whole subsea hydraulic control system in the actual engineering can be accurately finished.
Owner:CHINA NAT OFFSHORE OIL CORP +2

Intelligent monitoring device for temperature and insulation state of 330KV high-voltage cable in hydropower station

InactiveCN102411119ASolve the problem of online real-time monitoringReduce labor intensityTesting dielectric strengthThermometer detailsCurrent sensorData acquisition
The invention discloses an intelligent monitoring device for temperature and insulation state of a 330KV high-voltage cable in a hydropower station. The device is characterized by being provided with a central processing module unit (CPU), a data acquisition and conversion unit, a light transmitting/receiving module, an alarm output module, a plurality of optical fiber temperature sensors and a plurality of current sensors, wherein the data acquisition and conversion unit is used for transmitting digital signals to the CPU under the control of the CPU; the light transmitting/receiving module is used for transmitting electrical signals to the data acquisition and conversion unit; the alarm output module can be used for communication with a remote monitoring system; the optical fiber temperature sensors are respectively arranged at the joints of the high-voltage cable to be detected and used for connecting temperature detection signals to the light transmitting/receiving module; and thecurrent sensors are respectively arranged on joint metal sheaths of the high-voltage cable to be detected and used for connecting current detection signals to the data acquisition and conversion unit. The device is particularly suitable for safety monitoring of the 330KV high-voltage cable in the hydropower station, can realize real-time monitoring of the temperature and the insulation state of the cable in the hydropower station, and can also ensure self safety.
Owner:HEFEI UNIV OF TECH

Power distribution network reactive power optimized dispatching method and system based on virtual power plant

ActiveCN105071410AProvide power quality and reliabilityImprove utilization efficiencyReactive power adjustment/elimination/compensationReactive power compensationPower stationEngineering
The invention relates to a power distribution network reactive power optimized dispatching method and a power distribution network reactive power optimized dispatching system based on a virtual power plant. Each node accessed along a feed network is connected and provided with a monitoring device. The control process comprises the steps that: when a current dispatching time period of the virtual power plant begins, the monitoring devices upload real-time voltage effective values of the accessed nodes to a centralized controller of the virtual power plant; the centralized controller establishes a reactive power optimized dispatching model and solves the model to obtain reactive output set values of distributed power supplies; and the centralized controller sends the reactive output set values to the distributed power supplies, and the distributed power supplies correspondingly output reactive power to a feeder line. Through the optimized dispatching of the centralized controller, the sum of values that voltages of the nodes in the power distribution network deviate from a rated value is minimal, the total cost of carrying out reactive dispatching on the distributed power supplies is minimal, the power supply quality and reliability is improved, the auxiliary service function of the distributed power supplies is fully exerted, the service efficiency of the distributed power supplies is improved, and the development and use of the distributed power supplies are promoted.
Owner:WUHAN UNIV

Reliability evaluation method of pumped storage system based on multiple wind power plants

ActiveCN106447218AIncrease profitTake advantage ofSystems intergating technologiesResourcesEnvironmental resource managementPower station
The invention discloses a reliability evaluation method of a pumped storage system based on multiple wind power plants. The method includes the following steps: 1, based on relevant characteristics of wind speeds of two adjacent wind power plants, calculating wind speed time series of the wind speeds of the two adjacent wind power plants according to an ARMA method; 2, establishing a reliability evaluation model of the pumped storage system based on the wind power plants; 3, conducting reliability evaluation on the reliability assessment model, obtained in step 2, of the pumped storage system based on the wind power plants by using a sequential Monte Carlo method. The method has the advantages that wind speed related informationis close to that in a real situation, in the evaluation process, the influences of the installed capacity, pumping efficiency and operation strategy of pumped power stations are taken into account, the use of pumped storage system can reduce the abandoned wind amount and improve the wind energy utilizationrate, and the impacts of wind electricity fluctuation on the security of electric power security systems are reduced.
Owner:CHONGQING UNIV +3

Automatic verification method and system of coal mill inlet air quantity measuring apparatus

ActiveCN105699040AIncrease job securityHigh working reliabilityAerodynamic testingMeasurement devicePower station
The invention provides an automatic verification method and a system of a coal mill inlet air quantity measuring apparatus, and is applied to inlet air quantity measuring apparatuses of a power station boiler pulverizing system. The automatic verification method of the coal mill inlet air quantity measuring apparatus includes: an air quantity calibration instruction is received, according to the air quantity calibration instruction, a coal mill outlet fast-closing door, a hot primary air adjusting door, a cold primary air adjusting door, and an inlet isolation door are opened, and a coal mine ventilation channel is established; in the condition of different air quantities, the air temperature, the air speed, and the air pressure in each coal-conveying pipeline are measured, and the air quantity in each coal-conveying pipeline is calculated according to the air temperature, the air speed, and the air pressure; according to the sealing air quantity, the coal mill inlet air quantity, and the air quantity in each coal-conveying pipeline, coal mill inlet air quantity verification coefficients in different conditions are calculated; the deviation of the inlet air quantity verification coefficients in different air quantity conditions and the average inlet air quantity verification coefficient is calculated; and whether the work state of the inlet air quantity measuring apparatus satisfies the predetermined condition is determined according to the deviation.
Owner:STATE GRID CORP OF CHINA +1

Energy storage optimal configuration method and system

ActiveCN110676863AProfit maximizationFacilitate large-scale applicationSingle network parallel feeding arrangementsAc network load balancingPower stationProcess engineering
The invention provides an energy storage optimal configuration method and system. The energy storage optimal configuration method comprises the following steps: determining the discharge price of an energy storage power station during peak period, determining the charging price of the energy storage power station during valley period and determining the compensation price of auxiliary services forthe energy storage power station participating in peak shaving; determining the maximum net income of the energy storage power station based on the discharge price of the energy storage power stationduring the peak period, the charging price of the energy storage power station during the valley period and the auxiliary service compensation price of the energy storage power station participatingin peak shaving; and determining the capacity allocation of the energy storage power station based on the maximum net income and constraint conditions of the energy storage power station. According tothe energy storage optimal configuration method and system, electronic equipment and the storage medium, the energy storage power station is optimally configured based on the price mechanism so thatthe optimal capacity configuration of the energy storage power station can be determined, the income of the energy storage power station can be maximized and the large-scale application of the energystorage power station can be facilitated.
Owner:ELECTRIC POWER RES INST OF STATE GRID ANHUI ELECTRIC POWER +4

Intelligent front-end multimedia information acquisition system used for accurately monitoring power station equipment

PendingCN107885156AAccuracyIntegrityProgramme control in sequence/logic controllersData compressionPrivate network
The invention provides an intelligent front-end multimedia information acquisition system used for accurately monitoring power station equipment. The system comprises a plurality of groups of data acquisition devices arranged in a production area I. The data acquisition devices are connected with equipment systems in the production area I. The data acquisition devices are further connected with anintelligent front-end data server arranged in a production area II through a first one-way safety isolation device. The intelligent front-end data server is connected with a second one-way safety isolation device. The second one-way safety isolation device is connected with a cloud server arranged in a management information large area through a private network. The system does not perform the simple lossy compression on acquired real-time data, wherein the sampling frequency and the data compression are dynamically adjusted according to actual needs. Meanwhile, data acquired in real time arestored in a structured database, while data not acquired in real time are stored in a non-structured database. Moreover, the data acquired by the system has the advantages of accuracy, integrity andconsistency. The system is safe in data transmission and high in efficiency. The same coding rule is adopted, and the data application is more efficient, more convenient and more purposeful.
Owner:SHANGHAI POWER EQUIP RES INST

Cross-basin water transfer and energy storage system and water transfer and energy storage method

InactiveCN109113019AHydraulic engineering apparatusMarine site engineeringEngineeringDrainage basin
The invention discloses a cross-basin water transfer and energy storage system and a water transfer and energy storage method, particularly relates to various major basins and main power grids, and belongs to the field of the water resource and energy storage. The disclosed cross-basin water transfer and energy storage system is a multi-level system formed and constructed through various cross-basin water ways and water transfer and energy storage power stations according to the provided water transfer and energy storage technical method; and by means of the cross-basin water transfer and energy storage system, water resource allocation of various area scales can be achieved, and meanwhile corresponding water power energy storage systems can be established. According to the disclosed cross-basin water transfer and energy storage system embodiment, the purposes and the application are not limited in establishing of a cross-basin river and lake major cycle and the water transfer and energy storage power stations at the corresponding nodes, macroscopic overall water resource allocation can be achieved, meanwhile, grid-connection regulation and control are conducted on the state grid corporation of China and the China southern power grid, and in other words, river and lake energy storage and water power generation can be achieved; and the problems about water resource supply and demand contradiction and development and utilization and the problems about electric power supply and demand contradiction and energy abandoning are effectively solved.
Owner:北京水沃新华科技有限公司

Cascade hydropower station optimal scheduling system and method and safety power grid system

ActiveCN110912200AReasonable abandonment of waterWater abandonment risk balanceSingle network parallel feeding arrangementsSystems intergating technologiesPower stationOptimal scheduling
The invention discloses a cascade hydropower station optimal scheduling system and method, and a safety power grid system, and the method comprises the steps: carrying out the preliminary calculationof each power station of a cascade power station group through the predicted storage flow condition and planned output of each power station of the cascade power station group, and obtaining the stateof the cascade power station group; traversing the state sequence of each power station of the cascade power station group according to the time sequence, if the state of the current time period of the cascade power station group meets the set requirement, completing the calculation of the scheduling time period, and if not, performing water abandoning risk assessment according to the length of the pre-abandoning time, and performing output adjustment on the current time period. Through the scheme provided by the invention, each cascade power station is balanced in water abandoning risk underthe condition of meeting cascade overall operation optimization in the whole dispatching process, water abandoning is relatively reasonable, cascade water and electricity operation is optimized, andcascade water energy resources are fully utilized.
Owner:GUIZHOU POWER GRID CO LTD

Waste gas neutralization treatment device for thermal power plant

The invention discloses a waste gas neutralization treatment device for a thermal power plant, relates to the technical field of waste gas treatment equipment, and solves the problems that most of existing waste gas treatment equipment needs to be additionally matched with a cleaning assembly for a smoke exhaust mechanism such as a chimney, an original spraying assembly cannot be used for internal cleaning, and the manufacturing cost of the equipment cannot be reduced. The waste gas neutralization treatment device for the thermal power plant comprises a chimney, the chimney is of a circular structure, a settlement cover is welded to the bottom of the chimney, a discharge pipe is welded and communicated to the bottom of the settlement cover, four vertical supporting shafts are symmetrically welded to the bottom of the chimney, and an annular base is welded and fixed to the bottoms of the four vertical supporting shafts; and two electric push rods are symmetrically mounted on the top end sections of the two vertical supporting fulcrum shafts which are in bilateral symmetry in a hanging and supporting mode, and a baffle is locked and fixed to the bottoms of the two electric push rods. The trouble that six vertical water spraying pipes are subjected to steering switching through manual driving operation can be omitted, and use is convenient, labor-saving and rapid.
Owner:杜苏月

Method for preventing concrete of spillway tunnel of hydropower station from cracking

The invention discloses a method for preventing concrete of a spillway tunnel of a hydropower station from cracking and a concrete modification method and particularly relates to a method for modifying the concrete in the spillway tunnel of the hydropower station. According to the method for preventing concrete of the spillway tunnel of the hydropower station from cracking, after the scouring-resistant and abrasion-resistant concrete of the spillway tunnel is poured, no crack is found, and chemical grouting and polymer chemical material sealing treatment are conducted on construction joints and structural joints prearranged in the concrete construction process; detection is conducted in the tunnel after water is introduced into the tunnel for six months, no crack exists on the concrete in the tunnel, and the construction joints and the structural joints prearranged in the construction process are not changed obviously after being scoured. According to the method, through full-responsibility layering and blocking and prearranging of the construction joints, foundational restraints are effectively reduced, and the concrete construction quality is strictly controlled; a comprehensive temperature control measure is taken, so that cracks, which are not arranged in advance, of the concrete are effectively avoided, chemical grouting and polymer chemical material sealing treatment are conducted on the prearranged regular joints, and thus concrete treatment can meet the design requirement.
Owner:中国安能集团第一工程局有限公司

Power station boiler balanced combustion optimization method based on data driving

InactiveCN113760018ABurn evenlyBalanced Burn AdjustmentSimultaneous control of multiple variablesCombustorPower station
The invention discloses a power station boiler balanced combustion optimization method based on data driving, which includes a front-end sensor, a data model, a balanced combustion control center, flow velocity adjusting equipment, combustors and a flow velocity and flow measurement sensor, wherein the front-end sensor is used for detecting parameters reflecting the combustion state in a hearth, the data model analyzes and judges whether deviated combustion and insufficient combustion exist in the hearth or not, the balanced combustion control center receives output of the data model and air powder flow velocity and flow parameters measured by the flow velocity and flow measurement sensor, then analyzes and calculates an adjusting instruction, and sends the adjusting instruction to the flow speed adjusting equipment, and the flow speed adjusting equipment can change the resistance of a primary air pipeline and adjust the air powder flow speed and flow of the corresponding combustor, so that air powder combustion of all the combustors is optimized, sufficient combustion is achieved, and the combustion efficiency is improved. Primary air powder deviation can be adjusted on line under data driving, deviation combustion in the furnace is effectively solved, the combustion efficiency is improved, and coal consumption is reduced.
Owner:芜湖发电有限责任公司 +1

Integrated monitoring system for power station steam turbine electric hydraulic control system based on Modbus protocol

ActiveCN105867316ARealize the monitoring functionRealize the operation functionTotal factory controlProgramme total factory controlAutomatic controlE communication
The invention discloses an integrated monitoring system for a power station steam turbine electric hydraulic control system based on a Modbus protocol, which relates to an automatic control system for generating station unit equipment and particularly relates to a Modbus protocol-based power station equipment DCS (Distributed Control System) integrated monitoring system. The system of the invention is composed of a steam turbine electric hydraulic control system, a unit DCS control system and a data communication network, wherein the data communication network comprises an EHCS (Electric Hydraulic Control System)-side communication interface station and a DCS-side communication interface card; the EHCS-side communication interface station is interconnected with the DCS-side communication interface card via a serial converter. Data communication is realized through the Modbus protocol, the unit DCS control system executes a monitoring operation process on the steam turbine electric hydraulic control system through an operator station, monitoring and operation on all important parameters and equipment of the steam turbine electric hydraulic control system are completed, the training workload and the maintenance workload of an operator can be greatly reduced, and the technical problems of not high information and data sharing degree between the power station steam turbine electric hydraulic control system and the unit DCS control system which are mutually independent and have different regulations and low system integration degree can be solved.
Owner:BAOSHAN IRON & STEEL CO LTD

Roof rainproof power station photovoltaic convergence box protection cover

InactiveCN106100572AImprove protectionImprove the effect of rain protectionClimate change adaptationPhotovoltaicsPower stationEngineering
The invention discloses a roof rainproof power station photovoltaic convergence box protection cover, which comprises a base plate and a top plate, and is characterized in that the bottom end of the top plate is provided with an inner corner plate, both the left side and the right side of the bottom end of the base plate are provided with an isolation plate, the bottom end inside the base plate is provided with a sliding rail, the left side inside the base plate is provided with a rotating wheel, the rotating wheel is connected with the sliding rail through a connecting column, the outer side of the rotating wheel is provided with a rotating sleeve, and the right end of the rotating sleeve is provided with a telescopic baffle plate. According to the roof rainproof power station photovoltaic convergence box protection cover, through cooperation of the inner corner plate, the isolation plates and the telescopic baffle plate, the rainproof performance of the top plate is improved by the inner corner plate, the base plate is placed on the isolation plates so as to prevent the base plate from being eroded and damaged by being directly contacted with the ground, the placement height of the isolation plate is adjusted through cooperation between a screw and a rotary table and a rotary groove, the rainproof effect is improved, the telescopic baffle plate is taken out through cooperation of the rotating sleeve and the sliding rail, and the rainproof performance of a convergence box is improved. Meanwhile, overhauling is carried out conveniently, and protection for the convergence box is greatly enhanced.
Owner:天津滨新太阳能发电有限公司

Ash bucket feeding equipment for thermal power plant

The invention discloses ash bucket feeding equipment for a thermal power plant. The ash bucket feeding equipment for the thermal power plant comprises bases and a vibration motor, wherein supporting columns are fixedly installed at the tops of the bases; a supporting plate is fixedly installed at the top ends of the supporting columns; an ash bucket is fixedly installed at the bottom of the supporting plate; the top of the ash bucket fixedly communicates with an ash inlet pipe; the bottom of the ash bucket fixedly communicates with an ash outlet pipe; a valve is movably installed on one side of the ash outlet pipe; a control panel is detachably installed on the front part of one base; and an anti-blocking mechanism is movably connected into the ash hopper. According to the scheme, the vibration motor can directly transmit vibration to dust through a second motor box, then a rotating motor can drive a movable rod, a connecting rod and a brush plate to rotate through a rotating rod, when the movable rod and the connecting rod rotate, the dust can become loose, and the brush plate can brush off the dust adhering to the inner wall of the dust hopper, so that the ash loosening work can be completed within a short time, and the situation that the service life of the ash bucket is shortened due to the fact that the vibration motor vibrates the ash bucket is avoided.
Owner:DATANG HUAIBEI POWER PLANT

Novel concave component

PendingCN109599451AIncrease incidenceIncrease power generation outputPhotovoltaicsPhotovoltaic energy generationPower stationEngineering
A novel concave component is composed of an inner component and an aluminum frame, wherein the inner component is a double-wave component composed of the following materials arranged in sequence: front glass, packaging material, a solar cell, back panel glass and a junction box. The inner component is combined with the aluminum frame by using a framing device, so that an alpha angle is concavely formed by the concave component along the short side direction, wherein the alpha angle is an included angle between the connecting line of the short side end point of the concave component and the connecting line of the short side middle point of the concave component, the alpha angle is 2-0.3 degrees, and the longitudinal direction of the component is kept straight. The invention provides a novelconcave component framing method, which uses a curved frame and utilizes the self-toughness of the component to make the component concave to form a concave surface, and the component is concavely formed with a curved reflecting surface, so that multiple reflections are formed on the surface of the component, thereby increasing the amount of incident of the secondary reflected light, and increasing the power generation output of the power station.
Owner:CHANGZHOU ALMADEN

Water storage tank circular seam structure and manufacturing method thereof

ActiveCN109945155AReduce consumptionReduce the positive deviation of wall thicknessSteam boilersSteam boilers componentsManufacturing technologyPower station
The invention discloses a water storage tank circular seam structure and a manufacturing method thereof, and relates to the technical fields of high-capacity power station boiler water storage tank designing and manufacturing. The problems that an existing water storage tank circular seam structure is single in manufacturing method and lag in manufacturing technology, thus, a manufactured water storage tank is large in wall thickness margin, serious in inner surface wall thickness decreasing, discontinuous in structure and poor in machining quality are solved. According to the water storage tank circular seam structure, a water storage tank comprises two sealing heads and a plurality of barrel sections, all the barrel sections are sequentially spliced into a barrel body along the axes of the barrel sections, the two sealing heads are arranged at the two ends of the barrel body correspondingly, the ovality of the barrel body and the sealing heads is +/-0.6mm, and the thickness deviationbetween the barrel body and the sealing heads is 0-2mm; and a butt-joint circular seam groove is formed between every two adjacent barrel sections, a butt-joint circular seam groove is formed betweeneach sealing head and the corresponding barrel section adjacent to the sealing head, and the butt-joint circular seam grooves are connected through a welding mode. The manufacturing method is used for manufacturing of the water storage tank circular seam structure.
Owner:HARBIN BOILER

Mobile energy storage power station system

PendingCN107732948AIncrease acceptance rateTake advantage ofElectrical storage systemAc network load balancingPower qualityMicrogrid
The invention discloses a mobile energy storage power station system. According to the system, batteries are assembled into a battery pack by means of series-parallel connection; the working status ofeach battery is monitored through an BMS (battery management system); the charging and discharging process of the battery pack is completed through a PCS (process control system); a fire-fighting system, a monitoring system, a security system and other systems are arranged in the mobile energy storage power station system, so that a separate cabinet-type energy storage power station can be formed; an external power grid or new energy generation system is adopted to charge the energy storage station; and during discharging, stored electric energy is sent to a power grid or directly transportedto a use place with a wheeled trolley, so as to be transmitted to a user. With the mobile energy storage power station system of the invention adopted, the flexibility of electric energy supply can be improved, which mainly is reflected in the following facts that: the volatility of new energy power generation can be eliminated; a capacity to absorb new energy to realize grid connection is improved; load peak-to-valley differences can be reduced; the utilization rate of a power generation system can be improved; power supply reliability and power quality can be improved; the development of microgrids can be promoted; and maneuvering, efficient and large-capacity emergency backup power sources can be provided.
Owner:央信环保集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products