Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

80 results about "Geotechnical engineering" patented technology

Geotechnical engineering is the branch of civil engineering concerned with the engineering behavior of earth materials. Geotechnical engineering is important in civil engineering, but also has applications in military, mining, petroleum and other engineering disciplines that are concerned with construction occurring on the surface or within the ground. Geotechnical engineering uses principles of soil mechanics and rock mechanics to investigate subsurface conditions and materials; determine the relevant physical/mechanical and chemical properties of these materials; evaluate stability of natural slopes and man-made soil deposits; assess risks posed by site conditions; design earthworks and structure foundations; and monitor site conditions, earthwork and foundation construction.

Methods for characterization of petroleum reservoirs employing property gradient analysis of reservoir fluids

ActiveUS20130151159A1Accurate representationElectric/magnetic detection for well-loggingConstructionsReservoir fluidPetroleum reservoir
A methodology for reservoir understanding employs analysis of fluid property gradients to investigate and distinguish between non-compartmentalization of the reservoir, compartmentalization of the reservoir, and lack of thermodynamic equilibrium in the reservoir.
Owner:SCHLUMBERGER TECH CORP

Drilling efficiency through beneficial management of rock stress levels via controlled oscillations of subterranean cutting elements

ActiveUS20060157280A1Reduce lossReducing actionDrill bitsDrilling rodsStress levelSoil horizon
A device and system for improving efficiency of subterranean cutting elements uses a controlled oscillation super imposed on steady drill bit rotation to maintain a selected rock fracture level. In one aspect, a selected oscillation is applied to the cutting element so that at least some of the stress energy stored in an earthen formation is maintained after fracture of the rock is initiated. Thus, this maintained stress energy can thereafter be used for further crack propagation. In one embodiment, an oscillation device positioned adjacent to the drill bit provides the oscillation. A control unit can be used to operate the oscillation device at a selected oscillation. In one arrangement, the control unit performs a frequency sweep to determine an oscillation that optimizes the cutting action of the drill bit and configures the oscillation device accordingly. One or more sensors connected to the control unit measure parameters used in this determination.
Owner:BAKER HUGHES INC

Method of analysis logging combination feature and seismic facies to predict coal quality

ActiveCN103091712AEfficient acquisitionImprove fitSeismic signal processingWell drillingWell logging
The invention belongs to the field of coalbed methane exploration and development to predict the transverse distribution of the coal quality by integrated application information of logging, well drilling, earthquakes and geology. In research, the logging information is effectively used. The logging information is classified according to distribution characteristics of the lengthways combination of a main force coal seam and a small coal seam on the upper of the main force coal seam in the research object seam to predict transverse distribution of the coal quality by combining the transverse change of earthquake reflection characters caused by a coal seam. Appropriate parameters such as a time window are selected by analysis of logging information, earthquake root-mean-square amplitude is optimized to effectively depict a seismic facies belt, and predicted edges of the seismic facies belt are clear. A test site deposition geological background is analyzed synthetically, the logging information and seismic data are effectively used, the seismic facies and sedimentary facies of the test site are described, beneficial facies belts suitable for generation, aggregation and storage of the coal seam are optimized to achieve flat distribution depiction of various coal qualities, and the fit degree of the predicted result and the well drilling is high.
Owner:CHINA PETROLEUM & CHEM CORP +1

Drilling device for earthen archaeological site

ActiveCN104343383AOvercome time-consuming, labor-intensive and labor-intensive defectsGuaranteed to workDrill bitsConstructionsFlangeRotational joint
The invention discloses a drilling device for an earthen archaeological site. The drilling device is characterized in that a bottom plate is mounted on the upper surface of a slideway through two groups of bottom plate rollers; a pair of round guide rails is fixed on the bottom plate, and a motor mounting plate is mounted on the round guide rails through sliders; a gear motor is fixed on the motor mounting plate; a rotating connector is mounted on an output shaft of the gear motor in a sleeving manner; one end of a connecting sleeve is fixedly connected with the rotating connector through a flange, and the other end of the connecting sleeve is in sleeve joint with one end of a drill rod through threads; the other end of the drill rod is connected with a drill; and the drilling rod, the round guide rails and the slideway are parallel. According to the drilling device for the earthen archaeological site, when a drill tube penetrates into the earthen archaeological site continuously, a drill rod jacket arranged on the drill rod in a sleeving manner goes deep into earth mass with the drill rod and is supported on the earth mass through a drill rod support frame, further, the drill rod jacket can move forwards continuously with the drill rod, so that the drill rod is prevented from shaking in a drilling process, the drilling accuracy is guaranteed, safety and reliability are achieved, and the drilling device has the characteristics of convenience, fastness and high work efficiency.
Owner:SHAANXI NORMAL UNIV

Concrete curing device carried by secondary lining trolley and using method of concrete curing device

A concrete curing device carried by a secondary lining trolley and a using method of the concrete curing device are disclosed. The device comprises a water spraying system, the water spraying system comprises a water storage tank (1), a water spring pipeline and a water pump, the water spraying pipeline comprises a left arc-shaped water spraying pipeline (2) and a right arc-shaped water spraying pipeline (3), a plurality of spray heads (9) are arranged on the left arc-shaped water spraying pipeline (2) and the right arc-shaped water spraying pipeline (3) correspondingly, the left arc-shaped water spraying pipeline (2) is connected with the water storage tank (1), and the right arc-shaped water spraying pipeline (3) is connected with the water storage tank (1). The method comprises the steps of enabling a left arch ring (6) and a right arch ring (10) to rise above a top formwork of the secondary lining trolley, enabling the left arch ring (6) and the right arch ring (10) to cross edge formworks of the secondary lining trolley, adjusting the distance between each spray head (9) and secondary lining concrete, enabling the left arc-shaped water spraying pipeline (2) and the right arc-shaped water spraying pipeline (3) to spray water, and conducting water spraying curing on the concrete. According to the concrete curing device carried by the secondary lining trolley and the using method of the concrete curing device, the purpose that the concrete is cured timely after lining is subjected to formwork removing is achieved, and the problem that at present, concrete cannot be cured timely some time is solved.
Owner:CHINA RAILWAY 11TH BUREAU GRP +1

Combined splicing tubular pile and pile splicing method

The invention discloses a combined splicing tubular pipe. The combined splicing tubular pipe comprises at least two hollow pile bodies which are sequentially connected with each other, and is characterized by also comprising at least one steel tube body, the steel tube body is a hollow cylinder and sleeved on the outer circumference of the junction of two adjacent hollow pile bodies of the combined splicing tubular pile, the steel tube body is provided with a plurality of plug welding holes, and the steel tube body is connected with the hollow pile bodies through the plug welding holes in a welding manner. The inner side wall of the steel tube body is connected with the tail part of one pile body in a welding manner and then connected with the head of another pile body in a plug welding manner. The pile for the irrigation works is simple in pile splicing operation, high in carrying capacity and strong in bend resistance; the steel tube body is added on the junction of the two pile bodies, so that the carrying capacity of the pile for the irrigation works can be increased; the steel tube body is provided with the plug welding holes, and the steel tube body is connected with the pile bodies in the plug welding manner, so that convenience in welding is achieved, and time and labor are saved.
Owner:国鼎(南通)管桩有限公司

Underground preloading settlement monitoring system

InactiveCN104697493AHeight/levelling measurementTraffic capacityGeotechnical engineering
The invention relates to the technical field of geotechnical engineering monitoring, and discloses an underground preloading settlement monitoring system, which is arranged in a to-be-detected foundation soil layer and comprises a testing hole, a fixed rod, a signal cable, a settling tray, a liquid storage tank, a vibration wire type pressure sensor and a data receiving terminal, wherein the testing hole is formed in the to-be-detected foundation soil layer and the lower end of the testing hole stretches into a stable soil layer; the fixed rod is arranged in the testing hole and the lower end of the fixed rod is connected to the stable soil layer; the vibration wire type pressure sensor is arranged on the fixed rod; the settling tray is arranged in an orifice in the upper end of the testing hole; the liquid storage tank is arranged on the lower surface of the settling tray; a pressure pipe is connected o the liquid storage tank; the vibration wire type pressure sensor is connected to the tail end of the pressure pipe; and the data receiving terminal is in communication with and connection with the vibration wire type pressure sensor so as to acquire an electric signal of the vibration wire type pressure sensor. The settlement monitoring system disclosed by the invention is free of influence on the construction and traffic capacity of surface boats, and is safe and high in stability.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG

Automatic early warning and monitoring device system for urban road underground collapse

The invention discloses an automatic early warning and monitoring device system for urban road underground collapse, and belongs to a road geological disaster monitoring technology. According to the technical scheme, the system is characterized by comprising an underground early warning device and an overground early warning information receiver; a signal transmission module, a displacement sensor, a power supply and a power switch are fixedly connected to the side wall of the cavity in the body and are connected in series through wires; a horizontal transverse shaft is arranged in the sealedcavity, the two ends of the transverse shaft are rotationally connected with the inner wall of the cavity through bearings, and a displacement line is wound on the transverse shaft; a containing groove is formed in the lower end of the body, a falling body is arranged in the containing groove, one end of the displacement line is connected with the power switch, the other end of the displacement line enters the containing groove to be fixedly connected with the falling body, and the displacement sensor is close to the displacement line. The problem that the conventional monitoring technology isnot suitable for directly monitoring the underground collapse of the urban road is solved, and the effect of early warning before the pavement collapse is formed is achieved.
Owner:北京环安工程检测有限责任公司

Separated layer water injection string for petroleum exploitation and water injection process thereof

PendingCN111396007AOvercoming the problem of short shelf lifeRealize layered water injectionDrilling rodsFluid removalTubing hangerPetroleum oil
The invention provides a separated layer water injection string for petroleum exploitation and a water injection process thereof. The separated layer water injection string for petroleum exploitationcomprises a casing pipe and an oil pipe. A plurality of packers are arranged in the casing pipe in a packer sealing mode from top to bottom in sequence. The top of the oil pipe is connected with a tubing hanger. The bottom of the oil pipe penetrates through all the packers in sequence and is connected with a circular plug. An insertion seal is arranged between the oil pipe and each packer. A hydraulic safety joint is arranged in the position, above each packer, of the oil pipe. A water distributor is arranged in the position, below each packer, of the oil pipe. A circulating sliding sleeve isarranged between the hydraulic safety joint at the upper end of the oil pipe and the tubing hanger. Through the separated layer water injection string for petroleum exploitation, separated layer waterinjection can be realized; after the string gets blocked, casing milling and salvaging measures can be taken; and the problem that the separated layer effective period is shortened due to shaking ofan existing water injection string is solved.
Owner:天津克睿特维科技发展有限公司 +1

Drilling fluid sampler with anti-settling function for oil field

ActiveCN114439474APrevent sinkingImpact squeezeBorehole/well accessoriesSoil scienceAssay
The invention relates to the technical field of oil field well drilling samplers, in particular to a drilling fluid sampler with an anti-sedimentation function for an oil field. The technical problems that deep drilling fluid cannot be sampled, silt in the drilling fluid in a water bucket can be precipitated and attached to the bottom and the wall of the water bucket after sampling, the silt is inconvenient to be completely taken out of the water bucket, and the test and detection result is influenced during test and detection are solved. Comprising a third shell interior, a sampling mechanism and an anti-settling mechanism; the sampling mechanism is fixedly connected to the upper portion in the third shell, and the anti-sedimentation mechanism is fixedly connected to the interior of the sampling mechanism. By arranging the anti-sedimentation mechanism, four reciprocating lead screws are driven by four second gears to rotate, sediment of drilling fluid in the four sampling barrels is prevented from sinking to the bottom during standing, four second sliding plates are driven by the four reciprocating lead screws to slide, and the situation that when the four sampling barrels rotate, the sediment in the drilling fluid in the four sampling barrels is blocked is avoided. Sediment in the drilling fluid in the sampling barrel adheres to the wall under the action of centrifugal force.
Owner:CHENGDU RUOKE TECH CO LTD

Light soil roadbed structure, roadbed system and design method thereof

ActiveCN111395063AReduced upper loadDissipate train dynamic stressGeometric CADSewerage structuresSoil scienceGeotechnical engineering
The invention relates to the technical field of geotechnical engineering, in particular to a light soil roadbed structure, a roadbed system and a design method thereof. The light soil roadbed structure comprises a U-shaped groove body being a structural member made of light soil, a soil filler layer filling the U-shaped groove body, a supporting plate arranged at the bottom of the U-shaped groovebody, a supporting beam arranged at the bottom of the supporting plate, and a reinforcing pile assembly connected to the bottom of the supporting beam. The reinforcing pile assembly comprises a plurality of reinforcing piles. According to the disclosed light soil roadbed structure, the upper load of the reinforcing pile assembly is reduced by combining the light soil material and the vertical characteristic of the U-shaped groove body; most of the rising acting force on the side wall of the reinforcing pile can be transmitted back to the lower foundation through the anchoring effect of the pile body, so that the rise deformation of the roadbed can be effectively controlled, the overall load of the structure can be effectively borne, and the settlement deformation is controlled; moreover, the construction land is greatly saved, and the damage to the ecological environment is reduced.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Portable depth measuring device for hydraulic engineering

InactiveCN110595332AEasy to carryEasy to useMechanical depth measurementsElectric machineryEngineering
The invention discloses a portable depth measuring device for hydraulic engineering. The depth measuring device comprises a main rod, wherein one end of the main rod is fixedly connected with a grip;the grip is sleeved with an anti-slip rubber pad; an outer rod is fixedly connected below the other end, opposite to the grip, of the main rod; an inner rod is arranged in a groove of the outer rod; and one side of the inner rod is fixedly connected with a plurality of first gears. The depth measuring device has the beneficial effects that: the depth measuring device is convenient to carry and usethrough arranging the grip, a detection block is arranged, the main rod is moved to a position above the water surface by means of the grip when in use, the inner rod moves downwards by rotating a rotary handle, a servo motor is turned on to drive a winding disc to rotate when the inner rod touches the bottom, a steel wire is put down until the detection block makes contact with the water surface, the servo motor is turned off, the inner rod leaves the water bottom by means of the grip, the water depth can be detected by detecting the distance between the detection block and the bottom part of the inner rod through using a scaleplate, and the depth measuring device is more convenient to use and carry by adopting the design.
Owner:JINLING INST OF TECH

Quantitative evaluation method suitable for borehole wall stability of horizontal section of deep shale gas

PendingCN113033935AEstablishment of Uncertainty Quantitative Characterization MethodRealize quantitative evaluation of stabilityDesign optimisation/simulationResourcesWell drillingShale gas
The invention discloses a quantitative evaluation method suitable for the borehole wall stability of a horizontal section of deep shale gas. The quantitative evaluation method comprises the following steps: 1, quantitatively calculating formation collapse and fracture pressure; 2, quantitatively representing uncertainty of formation collapse and fracture pressure; 3, calculating the drilling ECD of the horizontal section of the shale gas, and quantitatively representing the uncertainty of the drilling ECD of the horizontal section of the shale gas; 4, based on the quantitative representation of the formation collapse and fracture pressure uncertainty in the step 2 and the quantitative representation of the shale gas horizontal section drilling ECD uncertainty in the step 3, quantitatively evaluating the shale gas horizontal section well wall stability, namely, an analysis model for quantitatively evaluating the well wall stability is established. According to the method, the difficulty in identifying the borehole wall instability of the horizontal section of the deep shale gas is solved, the quantitative evaluation of the borehole wall stability is realized, the fault occurrence rate can be effectively reduced, the drilling efficiency is improved, the drilling period is shortened, and technical support is provided for reducing the cost and increasing the speed of shale gas drilling construction.
Owner:中石化石油工程技术服务有限公司 +2

Oil exploitation and sand removal all-in-one machine and sand removal method thereof

ActiveCN113482589AImprove stabilityAvoid the problem of flow rate dropFluid removalBernoulli's principleMining engineering
The invention relates to the technical field of energy exploitation, and discloses an oil exploitation and sand removal all-in-one machine and a sand removal method thereof. Fan blades in a turbine are close to the outer side, so that the flow speed of the outer side is larger than that of the center when oil generates vortexes; according to the Bernoulli principle, sand in the oil moves to the outer side; as the oil continuously enters the inner part of an oil cavity to enable the liquid level of the oil to continuously rise, the position, close to the center, of the liquid level of the oil in the oil cavity finally makes contact with the bottom of an oil outlet pipe; due to the fact that gravel in the center flows to the outer side at the moment, no gravel exists in the oil close to the center any more, then no gravel exists in the oil entering into the oil outlet pipe, and then filtering operation on the gravel in the oil is finished. Compared with a traditional device for filtering the gravel through a filtering element, the oil exploitation and sand removal all-in-one machine has the advantages that the problem that the flow speed is decreased due to the fact that a surface filtering screen is continuously blocked by the gravel while the gravel is filtered through the filtering element is well solved, and the flowing stability of the oil in the filtering process of the machine is improved.
Owner:张华

Connection method for wall sections of ultra-deep anti-seepage wall

The invention discloses a connection method for the wall sections of an ultra-deep anti-seepage wall. The connection method for the wall sections of the ultra-deep anti-seepage wall comprises the steps of sequentially arranging downwards a plurality of joint pipes onto the end head of a slotted hole, and pulling out the joint pipes in a process of pouring concrete into the slotted hole, wherein the step of sequentially arranging downwards a plurality of joint pipes onto the end head of the slotted hole comprises the following steps: arranging a valve assembly and an adjustment assembly at oneend of a bottom pipe of each of the plurality of joint pipes; arranging downwards each bottom pipe with the valve assembly and the adjustment assembly at the bottom of the slotted hole, configuring one end of each of the valve assembly and the adjustment assembly to face the bottom of the hole, so that in the process of pouring the concrete, the adjustment assembly adjusts the opening degree of the valve assembly of the bottom pipe, and the phenomenon of pipe casting is prevented; and when the joint pipes are pulled out in the process of pouring the concrete, a pulling-out time for the joint pipes is controlled according to the components of the concrete and an environment temperature, so that the concrete cannot be adhered to the outer walls of the joint pipes. According to the method, the concrete cannot be adhered when the joint pipes are pulled out, a high hole-forming rate is achieved, the drilling amounts of the concrete joints are greatly reduced, the comprehensive working efficiency of the anti-seepage wall is increased, and the ultra-deep anti-seepage wall without wall breakage is formed.
Owner:SINOHYDRO FOUND ENG

Anti-scouring system and method for pile foundation of offshore wind power

PendingCN113202129AReduce flow rateIncrease flow resistanceArtificial islandsClimate change adaptationWater flowStructural engineering
The invention discloses an anti-scouring system and method for a pile foundation of offshore wind power. The anti-scouring system for the pile foundation of the offshore wind power comprises a slope section system, a top section system and a three-dimensional supporting structure, wherein the three-dimensional supporting structure is trapezoidal and comprises a base, a top horizontal surface and an inclined slope surface, and the inclined slope surface is connected with the base and the top horizontal surface; the slope section system and the top section system are each of a grid structure, the grid system is composed of grids and stand columns, and each grid is vertically fixed by two stand columns; the vertical slope section system is arranged on the inclined slope surface, and the vertical top section system is arranged on the top horizontal surface. According to the anti-scouring system for the pile foundation of the offshore wind power, through a multi-layer grid structure, the water flow velocity is slowed down, and silt close to the bottom layer of a seabed is blocked; through the inclined slope surface of the three-dimensional supporting structure, the flow resistance is further increased, and the water flow speed is reduced; through the combination of the three-dimensional supporting structure and the grid structure, the seabed roughness is remarkably increased, the water flow speed is reduced, and the foundation anti-scouring purpose is achieved.
Owner:HUANENG CLEAN ENERGY RES INST

Foundation soil layer contour map drawing method

ActiveCN112529982ASimple stepsEasy to useDrawing from basic elementsDatabase management systemsData displaySoil science
The invention provides a foundation soil layer contour map drawing method, and belongs to the technical field of geotechnical engineering investigation, and the method comprises the following steps: S1, building a foundation soil contour map drawing drilling database; s2, processing abnormal data of a foundation soil layer; s3, surveying a drill hole data display point; s4, carrying out drilling and thinning; s5, analyzing the distance between the drill holes; and s6, drawing a foundation soil burial depth contour map. The method is concise in step, convenient to use, high in engineering applicability, rapid and convenient in mapping, high in precision and particularly suitable for foundation soil layer development distribution rule research of regional geology and geotechnical engineeringinvestigation projects.
Owner:TIANJIN TAIKAN ENG TECH CONSULTING CO LTD +1

Hole sealing, grouting and water plugging reinforcement method for anchor cable hole in roadway water spraying area

ActiveCN113153396AIncrease anchoring forceReduce rustAnchoring boltsGeotechnical engineeringStructural engineering
The embodiment of the invention discloses a hole sealing, grouting and water plugging reinforcement method for an anchor cable hole in a roadway water spraying area, and relates to the technical field of coal roadway mining surrounding rock control. Grouting reinforcement can be conducted on an existing anchoring anchor cable hole, so that water spraying of the anchor cable hole is reduced to a certain degree, corrosion of an anchor cable is slowed down, and the anchoring force of the anchor cable in a roadway water spraying area is enhanced. The hole sealing, grouting and water plugging reinforcement method for the anchor cable hole in the roadway water spraying area comprises the steps that a grouting hole is obliquely drilled in the periphery of an existing anchor cable hole in a top plate of the roadway water spraying area towards the interior of the anchor cable hole, and the grouting hole communicates with the anchor cable hole; a grouting pipe and a plugging pipe are inserted into the grouting hole, wherein an annular space is formed between the inner wall of the plugging pipe and the outer wall of the grouting pipe; a high-water-content rapid-hardening expansion material is poured into the anchor cable hole through the annular space in the plugging pipe; and after the high-water-content rapid-hardening expansion material is solidified, grouting is conducted in the deep area in the anchor cable hole. The reinforcement method is suitable for grouting reinforcement of the anchor cable hole in the water spraying area of the weakly cemented soft rock roadway.
Owner:NORTH CHINA INST OF SCI & TECH +1

Roadbed filler compaction quality control method and system

ActiveCN113215894AAccurate evaluationPrecise regulationGeometric CADRoadwaysSoil scienceQuality control
The invention discloses a roadbed filler compaction quality control method and system. The method comprises the following steps: acquiring compaction target information; drawing a dry density-mass moisture content relation curve graph according to the compaction target information; according to the dry density-mass moisture content relation curve graph, generating quality controllable data; and executing quality control operation through the quality controllable data. The method solves the problems that according to an existing compaction method and standard, the index values such as the mass moisture content, the dry density/compaction degree or the rigidity of compaction filler are controlled, the indexes cannot represent the unsaturated state, therefore roadbed design, compaction construction and normal service lack unsaturated soil theoretical correlation, it cannot be really and effectively guaranteed that the compaction characteristic meets design targets and service requirements such as post-construction volume change and water-force performance in the service period, space-time variability of compaction energy, filler physical states (types, gradation and the like) and the like in the field compaction process is not considered, and compaction quality evaluation indexes still need to be further improved.
Owner:CENT SOUTH UNIV

Fast explosive drilling device

InactiveCN111536844AImprove blasting effectImprove blasting efficiencyDrill bitsBlastingExplosive AgentsMining engineering
The invention provides a fast explosive drilling device which comprises a drill bit. The back end of the drill bit is connected to a flow guiding pipe body, an explosive injection hole is formed in the outer side wall of the back of the flow guiding pipe body in a rock drilling direction, an explosive injection channel is arranged in the flow guiding pipe body in a length direction, the explosiveinjection channel communicates to the explosive injection hole, a front sealing ring is arranged on the outer wall of the front part of the flow guiding pipe body in the rock drilling direction, a back sealing liquid ring is arranged on the outer wall of the back part of the flow guiding pipe body in the rock drilling direction, and the explosive injection hole is located in the front end of the back sealing liquid ring in the rock drilling direction. The fast explosive drilling device can be filled with a liquid explosive for explosion and is good in explosion effect. Explosion and rock drilling can be carried out simultaneously, and the explosive can be filled continuously without taking out a drill bit, so that the explosion efficiency is high.
Owner:李天北

Environment-friendly pervious concrete and preparation method thereof

PendingCN111116121AStable structureGood water permeabilityCeramicwareCement pasteColoring agents
The invention discloses environment-friendly pervious concrete and a preparation method thereof. The environment-friendly pervious concrete is prepared from cement, water, coarse aggregate, fine aggregate, an admixture, an additive, a coloring agent and thickening powder. The preparation method comprises the following steps: mixing the cement and the water and then stirring the mixture to be uniform to form cement paste; sequentially adding the coarse aggregate, the fine aggregate and the admixture into the cement paste in the step 1, and fully stirring and mixing to form an initial mixture; mixing an additive and a coloring agent together, adding the mixture into the initial mixture obtained in the step 2, and stirring and mixing the mixture to form a secondary mixture; putting the secondary mixture obtained in the step 3 on a concrete vibration table, and adding thickening powder to form a three-stage mixture; moving out the three-stage mixture in the concrete vibration table to formthe environment-friendly pervious concrete. In the invention, the reasonable coarse aggregate is selected and the fine aggregate is properly added, so that the preparation proportion of the environment-friendly pervious concrete is ensured, and the excellent pervious performance of the concrete is achieved.
Owner:安徽中宝建材科技有限公司

Same-hole multi-slurry injection machine tool and same-hole multi-slurry injection plugging method

PendingCN111877379AProtective foundationFoundation repairGeotechnical engineeringMachine tool
The invention provides a same-hole multi-slurry injection machine tool and a same-hole multi-slurry injection plugging method. The machine tool comprises a grouting head body, a grouting hard pipe andgrouting hoses; the grouting head body comprises two first grouting cylinder parts which are arranged side by side and a second grouting cylinder part, and one-way valve elements are arranged in thefirst grouting cylinder parts; a first transverse channel and a second transverse channel communicating the first transverse channel with the outside are communicated between the two first grouting cylinder parts, and a first temporary plug is arranged at the end, communicating with the outside, of the second transverse channel; a second temporary plug is arranged at the bottom of the second grouting cylinder part; the grouting hard pipe is communicated with the top of the second grouting cylinder part, and the grouting hard pipe is communicated with a hard pipe outer joint; and the grouting hoses are communicated with the tops of the first grouting cylinder parts, and hose outer joints are communicated with the grouting hoses. According to the same-hole multi-slurry injection machine tooland the same-hole multi-slurry injection plugging method, water stopping and leaking stoppage can be achieved rapidly, the soil body strength of a water stopping and leaking stoppage position can beimproved, the double-liquid grouting setting time is easy to master, and the grouting effect is good.
Owner:城盾隧安地下工程有限公司

Portable grouting device and grouting vehicle

The invention provides a portable grouting device and a grouting vehicle. The portable grouting device comprises a mobile grouting device, a power supply system and an air supply system, wherein the mobile grouting device comprises a flat car, and a first material cylinder, a second material cylinder, a grouting machine and an electric control cabinet are arranged on the flat car; a first materialsucking pump and a second material sucking pump are arranged in the first material cylinder and the second material cylinder respectively, the first material sucking pump and the second material sucking pump are correspondingly connected with a feeding port of the grouting machine through a material sucking pipe, a material conveying pipe is arranged at a discharging port of the grouting machine,and a grouting gun is arranged on the material conveying pipe; and the first material suction pump and the second material suction pump are correspondingly connected with the air supply system, and the electric control cabinet is connected with the power supply system through a cable. As the mobile grouting device and the power supply system and the air supply system are separately arranged, themovable grouting device is small in size and convenient to move so that the mobile grouting device can be moved into a narrow working area such as an underground tunnel for construction operation, andcompared with a large grouting device, the mobile grouting device is small and portable.
Owner:WELEAD INFRASTRUCTURE ENG TECH ZHENGZHOU LTD +1

Rock core sample storage equipment for geotechnical engineering exploration

InactiveCN112357432AQuickly change the deployment locationQuick pick and placeLarge containersTank wagonsRock coreElectric machinery
The invention discloses rock core sample storage equipment for geotechnical engineering exploration, and belongs to the technical field of civil engineering. The rock core sample storage equipment comprises a base, wherein the top surface of the base is fixedly connected with a support beam frame; a driving roller and a driven roller are rotationally connected between the inner surfaces of the support beam frame; the peripheral side surfaces of the driving roller and the driven roller are connected with two annular driving belts in symmetrical arrangement; a main driving motor is fixedly connected in a position, corresponding to the driving roller, on the surface of the support beam frame; one end of an output shaft of the main driving motor is fixedly connected with the driving roller; aset of storage mechanisms in equal-distance distribution is arranged on the surfaces of the two annular driving belts; and each storage mechanism comprises a positioning framework. Through the designof the annular driving belts and the storage mechanisms, the fixed storage structure of the conventional sample storage device is changed into a moving storage structure; through the moving storage structure, the arrangement position of the storage mechanisms can be fast changed; and through the fast change of the arrangement position, the fast taking and placing of the rock core samples can be convenient.
Owner:武宁宁
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products